My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-08-21_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2019-08-21_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 3:10:15 AM
Creation date
8/22/2019 12:02:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
8/21/2019
Doc Name
Adequacy Review Response
From
CC&V
To
DRMS
Type & Sequence
TR117
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'11-� <br /> NEWMONT <br /> GOLDCORR <br /> geogrid that are documented in the QC tests from Tensar. Please provide some <br /> clarification. <br /> The manufacturer performed quality control testing for each production lot. <br /> Geogrid rolls from the same production lot were frequently delivered on different <br /> dates. As a result, the QC test results were resubmitted when geogrid rolls from the <br /> same lot were delivered to the project site each time. A table of the geogrid <br /> inventory and testing is included in Attachment 4. <br /> 9. Section 3.5.2 — Conformance testing: Please address the following discrepancies and <br /> provide clarification: <br /> a. Appendix L.1, page 1, 40 mil testing in 2014 has the incorrect specifications <br /> quoted. <br /> The project technical specifications were revised by NewFields in June of 2016. The <br /> technical specifications for geomembrane (by AMEC) prior to this revision are <br /> included in Attachment 5 (Section 02776). Since this 40 mil LLDPE smooth <br /> geomembrane was delivered and installed prior to the revised specifications, the <br /> material was manufactured to conform to earlier technical specifications. <br /> b. Appendix L.2, All pages, 80 mil testing, all compliance tests reference the <br /> incorrect Ultimate Elongation value. <br /> The conformance test results have been revised to reference the ultimate <br /> elongation value of 250% minimum (per the technical specifications) and are <br /> included in Attachment 6. <br /> c. Appendix L.3, All pages, geogrid testing; all pages are out of order or there is <br /> incomplete testing batches provided, no clear order of testing, no dates of when <br /> the testing was conducted, no QC signature on individual pages or signed letter <br /> per testing batch. Because of the issue identified above it is difficult to determine <br /> what roll corresponds to which Tensar Corp QC test data. <br /> NewFields performed one conformance test per lot to verify that the geogrid <br /> met project specifications. The lot numbers on the Geogrid Conformance <br /> Test Certificates under"Sample Identification" in Appendix L.3 (2nd line top <br /> left corner) are in sequential order and cover each lot number shown on the <br /> Geogrid Roll QC Certificates in Appendix J.7 in the "Production Lot Number" <br /> column (2nd column from left). The table in Attachment 4 outlines that all <br /> lots were tested. <br /> 10. Section 3.5.3— Geomembrane Panel Deployment: Appendix F SLF Acceptance Forms, <br /> on pages 2, 3, 4, 5 and 10 the signature for Rene Torres does not match the date of the <br /> form or the other signatures. Please provide an explanation? <br /> Attachment 7 includes the revised SLF Acceptance Forms which have been initialed <br /> by Rene Torres, acknowledging that SLF was accepted on the date of the form. <br />
The URL can be used to link to this page
Your browser does not support the video tag.