My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-08-19_PERMIT FILE - M2019046 (4)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2019046
>
2019-08-19_PERMIT FILE - M2019046 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 3:04:53 AM
Creation date
8/19/2019 1:47:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019046
IBM Index Class Name
PERMIT FILE
Doc Date
8/19/2019
Doc Name
Application
From
Southway Construction
To
DRMS
Email Name
JPL
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- A portable asphalt plant with associated tanks <br /> - A portable concrete plant with associated tanks <br /> - Truck scales <br /> - A portable office trailer <br /> Equipment parking and maintenance <br /> - Overflow resource stockpiling <br /> - A portable crusher with associated tanks <br /> - Active pit serving as a stormwater settling pond <br /> - 250 gallon diesel fuel tank in secondary containment(110%of tank capacity) <br /> 1,000 gallon water tank used for dust suppression <br /> Portable lights with a generator for emergency after hours maintenance support <br /> The following list is the best estimate of equipment that will be used onsite throughout the mine <br /> life: <br /> - 2-4 Front end loaders <br /> - crushing and screening plant <br /> - 1-3 D-10 Bulldozer <br /> - 1 4000 gallon water truck <br /> - off-highway road haul trucks (number will depend upon production needs) <br /> - 15 and 24 ton on-road haul trucks (number will depend upon production needs) <br /> A portable asphalt plant may be erected on the site periodically. Material crushed and stockpiled <br /> on site may be used for asphalt production. Maximum asphalt production will not exceed 2,000 <br /> tons per day. Asphalt production may occur only during the warm season months of April <br /> through October. Components associated with the portable asphalt plant include: <br /> - Liquid asphalt storage <br /> - Aggregate feed bins <br /> - Mixer <br /> - Conveyors <br /> - Lime silo <br /> Bradford Mesa Quarry <br /> August 2019 D-9 ��T�' <br />
The URL can be used to link to this page
Your browser does not support the video tag.