My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-08-14_REVISION - M2002120 (5)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2002120
>
2019-08-14_REVISION - M2002120 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 8:38:53 AM
Creation date
8/15/2019 11:15:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002120
IBM Index Class Name
REVISION
Doc Date
8/14/2019
Doc Name
Discharge Report
From
Operator
To
DRMS
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Electrical <br /> Conductivity (EC), dS/m Report NA NA NA Quarterly Grab <br /> 00094 <br /> Selenium, Potentially <br /> Dissolved, ug/l 4.6 NA 18.4 0.69 2x/month Grab <br /> 01323 <br /> 1: Flow -The chronic flow limit is equal to the flow rate provided in the permit application, and will be <br /> stated on the certification. If power is not available, flow may be measured on an instantaneous basis. <br /> 2: Oil and Grease: - A visual observation of the discharge for each permitted outfall must be made <br /> 2 times per month. In the event an oil sheen or floating oil is observed, a grab sample shall be <br /> collected, analyzed, and reported on the DMR. In addition, corrective action shall be taken <br /> immediately to mitigate the discharge of oil. <br /> 3: Total Flow - Total flow is the cumulative flow of the discharge for the quarter in million gallons. If <br /> continuous flow monitoring is not conducted, the permittee must calculate the total flow for the <br /> month or quarter using the 30-day average flow (measured) and the number of days the facility <br /> discharged within the month or quarter. <br /> Modification 1: <br /> Modified and reissued date: 4/30/2018 Effective: 5/1/2018 <br /> In this modification, the division updated the certification as follows: <br /> 1) Added process water outfalls 002A and 003A. <br /> Certification issued: 12/14/2016 Effective: 1/1/2017 Expiration Date: 12/31/2021 <br /> This certification under the permit requires that specific actions be performed at designated times. The <br /> certification holder is legally obligated to comply with all terms and conditions of the permit. <br /> Approved by <br /> Kathleen Rosow <br /> Permits Unit 3 Work Group Leader <br /> Water Quality Control Division <br /> Page 3 of 3 <br /> 43(W C'hcuti Cioc.Dn tc J D,cm,•i 5:0 P ; ,-692_'i)()o Colorado_rl dph'e iNgcd <br /> lohn W Ilid. llloohct Gmcutw ' l arr} %Wk'Mr) '%I"'PI1.I Xccuutc t)uc tot and( hiei\Icdi�al 01'h,er <br />
The URL can be used to link to this page
Your browser does not support the video tag.