My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-08-14_REVISION - M2002120 (5)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2002120
>
2019-08-14_REVISION - M2002120 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 8:38:53 AM
Creation date
8/15/2019 11:15:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002120
IBM Index Class Name
REVISION
Doc Date
8/14/2019
Doc Name
Discharge Report
From
Operator
To
DRMS
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Oil and Grease Visual NA NA NA 2x/month Visual' <br /> 84066 <br /> Oil and Grease, mg/l NA NA 10 Contingent' Grab <br /> 03582 <br /> Site Specific Limitations <br /> Total Flow3, MG Report NA NA Continuous' Calculated <br /> 51500 1 Qrtr Total <br /> Electrical <br /> Conductivity (EC), dS/m Report NA NA Quarterly Grab <br /> 00094 <br /> Selenium, Potentially <br /> Dissolved, ug/l Report NA Report 2x/month Grab <br /> 01323 <br /> 1: Flow -The chronic flow limit is equal to the flow rate provided in the permit application, and will be <br /> stated on the certification. If power is not available, flow may be measured on an instantaneous basis. <br /> 2: Oil and Grease: -A visual observation of the discharge for each permitted outfall must be made <br /> 2 times per month. In the event an oil sheen or floating oil is observed, a grab sample shall be <br /> collected, analyzed, and reported on the DMR. In addition, corrective action shall be taken <br /> immediately to mitigate the discharge of oil. <br /> 3: Total Flow - Total flow is the cumulative flow of the discharge for the quarter in million gallons. If <br /> continuous flow monitoring is not conducted, the permittee must calculate the total flow for the <br /> month or quarter using the 30-day average flow (measured) and the number of days the facility <br /> discharged within the month or quarter. <br /> Permit Limitations and Monitoring Requirements apply to outfalls 002A and 003A as outlined in the <br /> Permit in Parts I.C.1, LID, and I.E. <br /> Crushed Stone and Construction Sand and Gravel Facilities (SIC Codes 1442) <br /> Permitted Feature ID: 002A and 003A <br /> Permitted Feature Type: External Outfall <br /> Limit Set: 2 <br /> Discharge Limitations <br /> Parameter Units <br /> Maximum Concentrations Monitoring Sample <br /> 30-Day 7-Day 2 Year Frequency Type <br /> Average Average Daily Max. Average <br /> Flow', MGD 1.5 NA Report NA Continuous' Recorder' <br /> 50050 <br /> pH, (Minimum- <br /> Maximum) s.u. NA NA 6.5-9.0 NA 2x/month Grab <br /> 00400 <br /> Total Suspended <br /> Solids, mg/1. 30 45 NA NA 2x/month Grab <br /> 00530 <br /> Oil and Grease Visual NA NA NA NA 2x/month Visual' <br /> 84066 <br /> Oil and Grease, mg/l NA NA 10 NA Contingent' Grab <br /> 03582 <br /> Site Specific Limitations <br /> Total Flow3, MG Report NA NA NA Continuous' Calculated <br /> 51500 1 Qrtr Total <br /> Page 2 of 3 ry <br /> 43N-( h rl (_ICCk on%c 1.Denv,�r.0)`<0246-1530 P;0A-692-2000 N Colorado_01 ll ph, RLILd ®{ a <br /> John W 11,,k.nloop (,owmot 1-arr� Wolk.%M-NISPH-1--WCL111\C : tur and ChICIA10(11 .tl(tfti 'r <br />
The URL can be used to link to this page
Your browser does not support the video tag.