My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-07-30_INSPECTION - C1982056
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1982056
>
2019-07-30_INSPECTION - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 7:59:37 AM
Creation date
7/31/2019 9:56:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Inspection
Doc Date
7/30/2019
Doc Name
Inspection Report
From
DRMS
To
Twentymile Coal, LLC
Inspection Date
7/23/2019
Email Name
TNL
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
July 23, 2019 C-1982-056/Foidel Creek Mine TNL <br /> 1005, Trout Creek <br /> 69, Trout Creek <br /> 301, Trout Creek before mine influence, samples and flow <br /> 1003, Fish Creek <br /> 27A, Fish Creek, above NPDES #62 inlet <br /> 305, Fish Creek, spring inlet upstream of 305 and downstream of 27A <br /> 29,Middle Creek, downstream of mine <br /> USGS 09243900,Foidel, downstream of mine <br /> 8, Foidel 1 st downstream of mine <br /> Site 900A, Foidel after Pond A inlet <br /> 14,Foidel source upstream of mine and pond A <br /> GENERAL MINE PLAN COMPLIANCE: <br /> The construction progress of a second thickener tank was observed during the inspection. The cement <br /> foundation is in place. The sides were being welded at the time of inspection. The pump house and pumps were <br /> in place. The operator stated the required perimeter ditch had been installed as approved under TR93. The project <br /> appears to be following the approved design. The dozer basin between the tank and Pond D was temporarily filled <br /> in to allow a cane to work in the area. The operator stated the basin would be reconstructed and Pond D cleaned <br /> once construction was progressed further. New culverts in the area of the tank appear to be in the approved <br /> location and of the approved size. <br /> Thistles are tall this summer and will need to be sprayed. <br /> DOCUMENTS RECEIVED <br /> OTHER(SPECIFY) <br /> Revisions currently under review: <br /> MR 314 Passive Treatment Inlet Pipeline Route Modification: Decision Due Date 8/5/2019 <br /> PR 12 Wolf Creek Reserve LBA Development and Mining: Decision Due Date Extended to 9/30/2019 <br /> ENFORCEMENT ACTIONS/COMPLIANCE <br /> No enforcement actions were initiated as a result of this inspection,nor are any pending. <br /> Number of Partial Inspection this Fiscal Year: 1 <br /> Number of Complete Inspections this Fiscal Year: 0 <br /> Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.