Laserfiche WebLink
Cripple Creek&Victor Gold Mining Company <br /> Squaw Gulch VLF Phase 2A Part 1 ■ <br /> Record of Construction Report <br /> 475.0106.032 <br /> July 22,2019 <br /> Appendix K.2 Geomembrane Trial Seam Summaries <br /> Appendix K.2.1 Geomembrane Fusion Trial Seam Summary <br /> Appendix K.2.2 Geomembrane Extrusion Trial Seam Summary <br /> Appendix K.3 Geomembrane Fusion Welding Summary <br /> Appendix K.4 Geomembrane Extrusion Welding Summary <br /> Appendix K.5 Geomembrane Destructive Testing Summaries <br /> Appendix K.5.1 Geomembrane Fusion Destructive Testing Summary <br /> Appendix K.5.2 Geomembrane Extrusion Destructive Testing Summary <br /> Appendix K.6 Geomembrane Pressure Testing Summary <br /> Appendix K.7 Geomembrane Defect/Repair Summary <br /> Appendix K.8 Geomembrane Acceptance Forms <br /> Appendix L Third Party Geomembrane Conformance Testing Results <br /> Appendix L.1 40mil LLDPE Geomembrane Conformance Testing <br /> Appendix L.2 80mil LLDPE Geomembrane Conformance Testing <br /> Appendix L.3 Geogrid Conformance Testing <br /> Appendix M Tensiometer Certifications <br /> P.\Projects\0106.032 VLF2 Phase 2 CQA\J-REPORTS\ROC Report 1\Cert Report-Phase 2A Part 1\475.0106.032 CCV PHASE 2A Part 1 <br /> ROC REPORT.docx <br />