My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-07-25_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2019-07-25_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 2:36:07 AM
Creation date
7/29/2019 9:02:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
7/25/2019
Doc Name
Request for Technical Revision
From
CC&V
To
DRMS
Type & Sequence
TR117
Email Name
TC1
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cripple Creek&Victor Gold Mining Company <br /> Squaw Gulch VLF Phase 2A Part 1 ■ <br /> Record of Construction Report <br /> 475.0106.032 <br /> July 22,2019 <br /> Appendix E Structural Fill Method Specifications <br /> Appendix F Soil Liner Fill Acceptance Forms <br /> Appendix G Weekly Reports <br /> Appendix H Photographic Documentation <br /> Appendix H.1 Photograph Log <br /> Appendix H.2 Construction Photographs <br /> Appendix I Laboratory Test Results <br /> Appendix 1.1 Coarse Shaft Backfill Laboratory Test Results <br /> Appendix 1.2 Underdrain Fill Laboratory Test Results <br /> Appendix 1.3 Select Structural Fill Laboratory Test Results <br /> Appendix 1.4 Structural Fill Laboratory Test Results <br /> Appendix 1.5 Leak Detection Fill Laboratory Tet Results <br /> Appendix 1.6 Soil Liner Fill Laboratory Test Results <br /> Appendix 1.7 Drain Cover Fill Laboratory Test Results <br /> Appendix J Geosynthetics Quality Control Documents and Inventory <br /> Appendix J.1 Geomembrane Inventory Control <br /> Appendix J.1.1 40mil LLDPE Geomembrane Inventory Control <br /> Appendix J.1.2 80mil LLDPE Geomembrane Inventory Control <br /> Appendix J.2 Resumes of Installation Personnel <br /> Appendix J.3 Geomembrane Roll QC Certificates <br /> Appendix J.3.1 40mil LLDPE Geomembrane Roll QC Certificates <br /> Appendix J.3.2 80mil LLDPE Geomembrane Roll QC Certificates <br /> Appendix J.4 Geomembrane Resin QC Certificates <br /> Appendix J.4.1 40mil LLDPE Geomembrane Resin QC Certificates <br /> Appendix J.4.2 80mil LLDPE Geomembrane Resin QC Certificates <br /> Appendix J.5 Welding Rod Quality Control Certificates <br /> Appendix J.6 Geotextile Roll Quality Control Certificates <br /> Appendix J.7 Geogrid Roll Quality Control Certificates <br /> Appendix K Geomembrane Installation Summaries <br /> Appendix K.1 Geomembrane Deployment Summary <br /> P:\Projects\0106 032 VLF2 Phase 2 CQA\J-REPORTS\ROC Report 1\Cert Report-Phase 2A Part 1\475.0106 032 CCV PHASE 2A Part 1 <br /> ROC REPORT.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.