July 10, 2019 C-1996-083/Bowie No. 2 Mine JHB <br /> Gob Pile 2 is inactive. BRL graded the top of Gob pile 2 last fall to help direct runoff away from the face of the <br /> pile. A couple of 1 1/2 to 2 foot deep gullies have formed in the top of the pile in the graded refuse material. All <br /> runoff still reports to the smart ditch or the benches, and ultimately reports to pond F. No grading of these gullies <br /> is needed as long as all material continues to be captured in the sediment control system. The east collection ditch <br /> continues to down cut. The wattle dams that BRL previously installed in the down cutting section of the east <br /> collection ditch failed to slow the flow down in this ditch. There is a sediment build up on bench 4 on Gob pile <br /> No. 2. Clearing of this sediment should assure that the flow turns to the east and continues to the east collection <br /> ditch instead of blowing out the berm and flowing down the face of the pile. <br /> Gob pile 4 has a good cover of perennial species on the lower benches. The slopes are stable and not eroding. <br /> The collection ditch on the north side of Gob pile 4 is functioning well. Noxious weeds have become established <br /> on the upper slope,Bench 5, on the west side of Gob pile 4. Scotch thistle was noted lower down on this slope, <br /> and Russian knapweed is present at the top of the Bench 5 slope. <br /> SUPPORT FACILITIES - Rule 4.04: <br /> A third party(Oxbow Mining, LLC) is in the process of constructing a methane flare unit to the north east <br /> of the sealed D portal fan in a previously disturbed materials storage area(MR200). The flare stack has been <br /> installed on the existing concrete pad. A portable generator is on site next to the concrete pad. The previously <br /> disturbed pad has been graded to a level working area. The generator was not running at the time of the <br /> inspection,No activity was occurring at the time of the inspection, and no personnel were present on the pad. <br /> Basil Bear anticipated that the flare would be operational in August. <br /> DOCUMENTS RECEIVED NA <br /> OTHER(SPECIFY)NA <br /> ENFORCEMENT ACTIONS/COMPLIANCE <br /> No enforcement actions were initiated as a result of this inspection,nor are any pending. <br /> Number of Partial Inspection this Fiscal Year: 1 <br /> Number of Complete Inspections this Fiscal Year: 0 <br /> Page 3 of 7 <br />