My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-06-14_INSPECTION - C1981010 (2)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981010
>
2019-06-14_INSPECTION - C1981010 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 10:58:25 AM
Creation date
7/15/2019 10:29:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Inspection
Doc Date
6/14/2019
Doc Name
Inspection Report
From
DRMS
To
Trapper Mining Inc
Inspection Date
5/9/2019
Email Name
RAR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 May 2019 C-1981-010/Trapper Mine RAR <br /> Inspection Topic Summary <br /> NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br /> R -Air Resource Protection R -Roads <br /> N -Availability of Records Y -Reclamation Success <br /> R -Backfill&Grading Y -Revegetation <br /> Y -Excess Spoil and Dev. Waste Y - Subsidence <br /> Y -Explosives R - Slides and Other Damage <br /> Y -Fish&Wildlife Y - Support Facilities On-site <br /> R -Hydrologic Balance N - Signs and Markers <br /> R -Gen. Compliance With Mine Plan N - Support Facilities Not On-site <br /> N -Other N - Special Categories Of Mining <br /> N -Processing Waste R -Topsoil <br /> This was a partial inspection of the Trapper Mine; C 1981010, operated by Trapper Mining Inc. The <br /> inspection was conducted and the report prepared by me,Robin Reilley of the DRMS. Photos included in <br /> this report were taken by Graham Roberts, and Robin Reilley. Appropriate credit was given in each <br /> photo. Graham Roberts, Trapper Mine representative was present throughout the inspection. Elevation <br /> validation for the 2018 Annual Reclamation Report(ARR)was conducted at this inspection. Skies were <br /> cloudy and temperatures ranged between 40 and 50 degrees Fahrenheit. <br /> An overburden blast was under development and a parting shot was observed in the afternoon. <br /> qu <br /> AL <br /> N <br /> Ili <br /> Y. n <br /> a <br /> p <br /> v l.. <br /> b, <br /> FR <br /> v„ <br /> ii <br /> v <br /> ll '1 w w • w m y <br /> u �iW 01 <br /> 4„ <br /> Photo 1: Active operations at the pit. Photo taken by R. Reilley. <br /> Number of Partial Inspection this Fiscal Year: 8 <br /> Number of Complete Inspections this Fiscal Year: 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.