Laserfiche WebLink
C3 <br /> 11. Please see revised copy of Storm Water Management Plan on pages 13-19. <br /> 12. Please see page 20 (3.1.9) "Topsoil salvage, storage and replacement" to see our commitment for <br /> seeding the topsoil stockpile within one growing season,to protect from erosion and build seed <br /> bank for revegetation. <br /> 13. Please see provided noxious weed control program that was submitted to, and was approved by <br /> the division on page 21. <br /> 14. Please see page 22 (f) (ii) seeding specifications. <br /> 15. Christian Construction will mark out permit boundaries and phases, please see page 23 (3.1.12) <br /> (2) affected area boundary markers. <br /> 16. Please see page 20 (3.1.9)(2) Wood vegetation shall be removed. <br /> Exhibit G—Water Information(rule 6A.7) <br /> 17. Please see page 24 exhibit G (2)(A) "If the operation is expected to directly affect surface or <br /> ground water systems then locate water structures facilities, etc. on exhibit C." (c) "Provide a plan <br /> showing bow water from dewatering operations or from runoff from disturbed areas, stockpiles, <br /> and operating surfaces will be managed to protect against pollution of surface and ground water, <br /> both during and after operations,"and page 25 (3) "Project water requirements for mining and <br /> reclamation." <br /> Exhibit M—Other permits and licenses(rude 6.4.13) <br /> 18. Please see provided copies of all permits approved on pages 26-34 exhibit M. <br /> Other permits and licenses(Rule 6.3.6) <br /> 19. Please see attached receipt to show that changes have been filed with Elbert County Clerk and <br /> Recorders office for public view. <br />