Laserfiche WebLink
i�Cude . <br /> RECEIVED <br /> C3 <br /> JUL 12019 <br /> CLAMA71ON <br /> July 9,2019 <br /> Colorado Division of Reclamation, Mining and Safety, <br /> Attention:Mr. Patrick Lennberg, <br /> Re: Preliminary adequacy review; 112C construction materials amendment application(AM-02) <br /> Elbert County Pit M-1985-129 <br /> Dear Mr. Lennberg, <br /> Christian Construction is replying to the changes requested by Colorado Division of Reclamation,Mining and Safety. The following <br /> changes have been made: <br /> Exhibit C—Preminine and Mining Plan Maps)of Affected Lands(Rule 6.4.3): <br /> 1. Topsoil stock piles for each phase have been added to the exhibit C map. No overburden piles are <br /> expected. <br /> 2. Please see the attached request from land owner on page 9 to release haul road and scale house <br /> from permit boundary. <br /> 3. Please see updated exhibit C map to show affected plans in relation to proposed mine. <br /> 4. Please see updated exhibit C map to show proposed stock pile locations for each phase. <br /> Exhibit D—Mining Plan (Rule 6.4.4)7 <br /> S. Please seepage 11 to explain the estimated depth and thickness to be mined. <br /> 6. Please see page 10 to explain the minimum and maximum area of disturbance at any one time <br /> including areas that will be in reclamation. <br /> 7. Please see page 10 (7) "Advancing to next phase" for an explanation on notifying the division 60 <br /> days before affecting a new phase and submitting cost estimate for reclamation. <br /> 8. Please see page 12 (3.1.5) "Reclamation measures-materials handling 1 grading, 2 backfilling, 3 all <br /> grading shall be done in a manner to control erosion and siltation of the affected lands, to protect <br /> the areas outside the protected lands from slides and other damage" <br /> Exhibit E—Recaawati"PJ"0.4.5) <br /> 9. No approval is needed to import inert fill as inert fill will not be needed. <br /> 10. Please see page 12 (3.1.5) as it will explain that mining will commence and end at a 3H:1V slope <br /> making inert fill unnecessary for reclamation. <br />