Laserfiche WebLink
PART <br /> Page 36 of 67 <br /> Permit No.:COG500000 <br /> 6. Consistency with Other Plans <br /> The permittee may incorporate,by reference,applicable portions of plans prepared for other purposes at their facility.Plans or <br /> portions of plans incorporated by reference into a SWMP become enforceable requirements of this permit and must be <br /> available along with the SWMP as required in Part.11.5 above. <br /> 7. Required SWMP Modifications <br /> a. 'Division initiated Modifications <br /> i. The permittee must modify the SWMP when notified by the Division that it does not meet one or more of the <br /> requirements of this permit. Unless otherwise provided by the Division,the permittee shall have 30 days after <br /> notification to make the necessary changes to the SWMP and implement them. <br /> ii. The Division may require the permittee to submit the modified SWMP to the Division. <br /> iii. If the Division determines that the permittee's stormwater discharges do not,or may not,achieve the effluent <br /> limits required by this permit,the Division may require the permittee,within a specified time period,to develop <br /> and implement a supplemental control measure action plan,which describes additional SWMP modifications to <br /> adequately address the identified water quality concerns. <br /> b. Permittee initiated Modifications <br /> i. The permittee must modify the SWMP whenever necessary to address any of the triggering conditions for <br /> corrective action in Part I.K(Corrective Actions)to ensure that they do not reoccur. <br /> H. The permittee must modify the SWMP whenever there is a change in design,construction,operation,or <br /> maintenance at the facility that significantly changes the nature of pollutants discharged in stormwater from the <br /> facility,significantly increases the quantity of pollutants discharged,or that requires the permittee to implement <br /> new or modified control measures. <br /> iii. The SWMP modifications may include a schedule for control measure design and implementation,provided that <br /> interim control measures needed to comply with the permit are documented in the SWMP and implemented <br /> during the design period. <br /> iv. The permittee must make all SWMP modifications in accordance with the corrective action deadline in Part I.K <br /> (Corrective actions). <br /> M. SPECIFIC SWMP REQUIREMENTS — Stormwater only <br /> 1. SWMP Administrator <br /> The SWMP shall identify a specific individual(s)by name or by title whose responsibilities include:SWMP development, <br /> implementation, maintenance,and modification. <br /> 2. Facility Description <br /> The facility description shall include: <br /> a. A narrative description of the industrial activities conducted at the facility; <br /> b. The total size of the facility property in acres; <br /> c. The general layout of the facility including mining areas,revegetated areas,buildings,raw material storage areas,and <br /> the flow of goods and materials through the facility. <br /> 3. Facility Map <br /> The SWMP shall include a legible site map(s),showing the entire facility, and vicinity as appropriate,identifying: <br /> 15 <br />