My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-07-11_REVISION - M1985129
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1985129
>
2019-07-11_REVISION - M1985129
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 12:37:29 PM
Creation date
7/12/2019 7:45:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985129
IBM Index Class Name
REVISION
Doc Date
7/11/2019
Doc Name
Adequacy Review - Preliminary
From
Christian Construction
To
DRMS
Email Name
JPL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase C contains the highest point of elevation at 6,830 feet. Phase A, B, C, and D will all be <br /> mined at a 3HAV slope from highest point on all sides down to an elevation 6,735 feet. Phase <br /> E's highest point of elevation is 6,750 feet and will be mined at a 3HAV slope down to an <br /> Elevation of 6,705 feet. The depth and thickness of the deposit is,uttknowrtn but will be mMvd <br /> at a maximum to a depth of 95'and a minimum of 5'. <br />
The URL can be used to link to this page
Your browser does not support the video tag.