My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-07-11_PERMIT FILE - M2019027
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2019027
>
2019-07-11_PERMIT FILE - M2019027
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 2:18:52 AM
Creation date
7/11/2019 2:03:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019027
IBM Index Class Name
PERMIT FILE
Doc Date
7/11/2019
Doc Name
Adequacy Review Response
From
Colorado Sand Company
To
DRMS
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C-19 r1 <br /> Washed Sand Stockpile and Decant S, sy tem <br /> Washed(interim)product from the wet plant will be delivered to a stockpile(Figure C-5: Wet Plant and <br /> Stockpile Decant System) via a 30" wide by 100-ft. long radial stacking conveyor unit. The anticipated <br /> maximum stockpile height is approximately 29-ft. The stockpile footprint will be approximately 215-ft.by <br /> 125-ft. in area,sufficient to accommodate an estimated 7,300 yd3 of(interim)product for a limited duration <br /> time period, during which excess moisture will be decanted from the material matrix for return to the wet <br /> plant clarifier. <br /> The decant system will employ a perforated pipe underdrain designed to drain to a common sump, from <br /> which recovered water will be pumped to the water clarifier unit for subsequent re-use. <br /> Drying and Screening Plant <br /> The drying and screening plant facilities will occupy an approximately 80-ft. by 130-ft. area within the <br /> west-central portion of the Permit Area. It will consist of an assemblage of(temporary)modular equipment, <br /> to include a rotary drying unit and various screening decks, all of which will be placed atop a timber or <br /> composite matting system. <br /> The dry plant process flow is depicted in Figure C-6: Dry Plant Process Flow Schematic;and,the overall <br /> dry plant facilities layout(through product loadout and truck scaling)is provided as Figure C-7: Dry Plant <br /> and Loadout Facilities. Additional detailed discussion of the plant equipment and process flow is provided <br /> above, in the Keenesburg Project Mining and Processing Overview. <br />
The URL can be used to link to this page
Your browser does not support the video tag.