Laserfiche WebLink
Jared Ebert <br /> July 8, 2019 <br /> Page 9 of 18 <br /> 26. Please commit to submitting the results of the nest surveys to be completed prior to the first year of <br /> construction during the winter months for the two potential raptor nests identified. Please add a <br /> section to Exhibit H that specifically addresses this commitment. <br /> The following text has been added to Section 3.2 of Exhibit H: "Nest surveys will be <br /> completed prior to the first year of construction during the winter months prior to leaf-out of <br /> trees in the Project. Results of the nest surveys will be provided to the DRMS." <br /> Rule 6.4.10, Exhibit J-Vegetation Information <br /> 27. Exhibit J consists only of the wetland delineation report. The majority of the information required by <br /> this exhibit is covered in the BRIR included in the Exhibit H, Please add a cover page to this exhibit <br /> directing readers to Exhibit H and the BRIR document for the information required by Exhibit J. <br /> The cover page has been added to exhibit J directing readers to Exhibit H and the BRIR <br /> document for the information required by Exhibit J. The information required by Exhibit J is <br /> included in Sections 2.2.2.4, 2.2.2.5, and Figure 3 of Exhibit H. <br /> 28. The Wetland delineation report identified at least three potential sites that may qualify as <br /> "Jurisdictional" in accordance with the United State Army Corps of Engineers ("USACE") <br /> requirements. The report indicates the Applicant will likely need to obtain the proper permit from the <br /> USACE prior to affecting these features. Please address the following: <br /> a. Add a buffer zone around all the wetland features identified by the Applicant on the appropriate <br /> Exhibit C map(s). Please commit to not affecting this buffer zone area until approval from the <br /> USACE is granted. Please add language to the mining plan to reflect this requirement. <br /> A buffer zone has been added around all the delineated features within the mining <br /> excavation limits on Exhibits C2 through C5. The buffer width is proportional to the planned <br /> depth of mining surrounding the delineated features. Note 16 has been added to Exhibit C-1 <br /> to state that wetlands buffer shall not be disturbed until USACE authorization has been <br /> obtained. <br /> b. Please commit to submitting documentation to the Division prior to affecting lands designated as <br /> "Jurisdictional Wetlands" by the USACE. <br /> Aggregate Industries will obtain authorization from the USACE to impact delineated features <br /> in the Project area. Aggregate Industries will provide this documentation to the DRMS prior <br /> to impacting any delineated feature in the Project area. <br /> c. Also please submit documentation that the wetlands the Applicant believes are not jurisdictional <br /> qualify for this designation. <br /> Aggregate Industries will obtain authorization from the USACE to impact delineated features <br /> in the Project area. Aggregate Industries will provide this documentation to the DRMS prior <br /> to impacting any delineated feature in the Project area. <br /> Rule 6.4.12, Exhibit L— Reclamation Cost Estimate <br /> Aggregate Industries—WCR,Inc <br /> 1687 Cole Blvd Suite 300 <br /> Golden,CO 80401 <br />