Laserfiche WebLink
Homestake Mining Company June 17.2019 <br /> Regular(112d)Operation Reclamation Permit Application Package <br /> Project Name: Pitch Mine Reclamation Project-Reclamation Plan <br /> Date of Submittal: March 1,2019 <br /> File Name: SRCE_Ver5ion_1_4_1_016c_2019-06-06_amh_User 3 Updates.xlsm <br /> Model Version:Version 1.4.1 <br /> Cost Data:User Data <br /> Cost Data File:SRCE_Cost_data-USR_1_12_2019-05-14.xlsm <br /> Cost Estimate Type:Surety Cost Basis:Northern Nevada <br /> EQUIPMENT FLEETS <br /> Use <br /> Standard Defined EQUIPMENT TOTAL LABOR TOTAL <br /> Labor Labor UNIT COST UNIT COST COST <br /> ACTIVITY AND FLEET Crew Crew (Hourly) (Hourly) (Hourly) <br /> RIPPING <br /> Rip road <br /> Waste rock dumps,heaps,tails-rip flat surfaces <br /> Surface preparation <br /> Scarify <br /> Small Dozer wl mufti-shank <br /> Deft I I 1 1 $92.391 $59.89 $152.28 <br /> Tm,,l,I I 1 1 $92.391 $59.891 $152.28 <br /> Medium Dozer w/multi-shank <br /> DBR 1 1 $159.691 $59.89 $219.58 <br /> Totals i 1 1 $159.691 $59.891 $219.58 <br /> Large Dozer w/mufti-shank <br /> D10R $274.98 $59.89 $334.87 <br /> T.tah,li 1 $274.991 $59.891 $334.87 <br /> Grader w/multi-shank <br /> 16G/H1 1 $182.771 $60.911 $243.68 <br /> Totals $182371 $60.911 $243.68 <br /> GRADING <br /> Grading storage and structure areas <br /> Gi ading waste rock dumps and heaps <br /> Grading landfills <br /> Constructing pit safety berms <br /> Small Dozer Fleet <br /> MR 1 1 $101.351 $59.89 $161.24 <br /> Totals 1 1 $101,351 $59.891 $161.24 <br /> Medium Dozer Fleet <br /> D8R $111.69 $59.89 219.58 <br /> Totals $159.69 $59.89 $219.58 <br /> Large Dozer Fleet <br /> 010R I I 1 1 $274,981 $59.89 $334.87 <br /> Tdalsl I 1 1 $274.981 $59.891 $334.87 <br /> EXPLORATION GRADING <br /> Backfilling and grading exploration trenches <br /> Grating flat explor anon roads <br /> Small Dozer Fleet <br /> 07R $101.351 $59.89 $161.24 <br /> Totals $101.35 $59.89 $161.24 <br /> Medium Dozer Fleet <br /> DIR 7T $159.69 $59.89 $219.58 <br /> Totals $159.69 $59.89 $219.58 <br /> Large Dozer Fleet <br /> 08R I I 1 1 $159.691 $59.991 $219.58 <br /> T.1al,J I 1 $159.691 $59.891 $219.58 <br /> Page 1 of 10 HOMESTAKE MINING COMPANY <br /> 120 of 164 <br />