Laserfiche WebLink
Homestake Mining Company June 17,2019 <br /> Regular(112d)Operation Reclamation Permit Application Package <br /> Project Name: Pitch Mine Reclamation Project-Reclamation Plan <br /> Date of Submittal: March 1,2019 <br /> File Name: SRCE_Version_1_4_1_016c_2019-06-06_amh_User 3 Updates.xlsm <br /> Model Version:Version 1.4.1 <br /> Cost Data:User Data <br /> Cost Data File:SRCE_Cost_data-USR_1_12_2019-05-14.xlsm <br /> Cost Estimate Type:Surety Cost Basis:Northern Nevada <br /> Erosion and Sedimentation Control <br /> Hourly productivity rates and crew composition from Means Heavy Construction 2005 Edition by permission of R.S.Means/Reed Construction Data. <br /> All equipment.labor and material unit costs are from Labor Costs.Equipment Costs and Material Costs s readsheets <br /> Daily <br /> Means Number Unit Crew Output Materials Labor I Equipment premium Total Notes <br /> Rip-Rap 3 RockUnfrig <br /> Ri Ra 3/8 to 114 CY m3pieces, routed 02370450-0110 S.Y. B-13 80 $30.18 $9.13 $39.31 assumes on-site source of ri+a <br /> Ri Rap 18 in 450 mm min thick no grout 02370-450-0200 S.Y. B-13 53 $8.75 $45.55 $13.78 $68.08 a surnes on-site source of d-ra <br /> Gabions.6 in 150 mm deep 02370450-0400 S.V. B-13 200 $12.07 $3.65 $15.72 assumes on-site source rock fill for abions <br /> Gabions.9 in 250 mm deep02370450-0500 S.V. B-13 163 $14.81 $4A8 $19.29 a n-site source rock fill for gabrons, <br /> Gabions.12 in 300 mm deep 02370450-0200 S.Y. B-13 153 $15.78 $4,77 $20.55 mite source rock fill for gabrons <br /> Gabions.18 in 450 mm deep 02370450-0200 S.Y. B-13 102 $23.67 $7.16 $30.83 mite source rock fill for gabrons <br /> Gabions.36 in(1 m)deep 02370450-0200 S.Y. B-13 1 60 $40,231 $12,17 $52.40on-site source rock fill for galoons <br /> MEP U3nerinstaliatlon <br /> Finish radio lar earea 2310-100-0100 S.F. B-11L 54000 $0,01 $0,02 $0.03 <br /> Compaction-riding,vibrating roller-12m 300mm lifts 2315-310-5100 C.V. B-10Y 2600 $0.30 $0.19 $0 49 <br /> 60 it HDPE 2660-610-0010 S.F. 3 Skwk 1600 $0.90 $0.49 10% $1.53 <br /> 80 mil HDPE user S.F. 3 Skwk 149 $9.00 $9.61 $5.25 $23,86 <br /> 40 mil VLDPE user S.F. 3 Skwk 150 $7.00 $9.55 $5.22 $21.77 <br /> GCL user S.F. 3 Skw/c 1 665 $4.32 $2.15 $1.18 $7.65 Units should be S.Y.and are calculated as such <br /> user S.F. 3 Skwk 1 Woo <br /> Construction Management Support <br /> Office Trailer.Furnished no hook-u s 0150-500-0250 $0.00 <br /> Toilet Portable.chemical 5590400-6410 1 mo. $0.00 <br /> $0.00 so 00 <br /> Pump and Casing Removal <br /> Pump Type Measurement Unit Labor Equipment Total Notes <br /> Pump Removal <br /> Submersible ft to pump L.F. 1 $0.00 <br /> Line Shaft ft to pump I L F I I 1 0.00 <br /> NOTES: <br /> 10 Pump Removal Source: <br /> Page 5 of 5 HOMESTAKE MINING COMPANY <br /> 119 of 164 <br />