My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-06-28_REVISION - M1977004 (8)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977004
>
2019-06-28_REVISION - M1977004 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2025 7:52:14 AM
Creation date
7/1/2019 2:09:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977004
IBM Index Class Name
REVISION
Doc Date
6/28/2019
Doc Name
Request For Amendment To Permit
From
Homestake Mining
To
DRMS
Type & Sequence
AM1
Email Name
DMC
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Homestake Miring Company June 17.201! <br /> Regu er 1112tl1 Operat-Reclamation Permit App$catmn Package <br /> Project Name:Pitch Mine Reclamation Project-Reclamation Plan <br /> Date of Submittal:March 1,2019 <br /> File Name:SRCE_Version_1_4_1_016c_2019-06-06_amh_User 3 Updates.xlsm <br /> Model Version:Version 1.4.1 <br /> Cost Data:User Data <br /> Cost Data File:SRCE_Cost_data-USR_7_72_2019-05-14.xlsm <br /> Cost Estimate Type:Surety Cost Basis:Northern Nevada <br /> Generic Material Hauling-Cost Summary <br /> quipmenl alena s ola s <br /> Haling/C,mWS—i,rVCompact S566.809 $1217256 NIA $1784065 <br /> Cover Placemem Cost $12.5% E40128 NIA E52.724 <br /> Topsoil PbcemeM Cosl $0 so NIA EO <br /> Ri i I6carR Cost $0 $ <br /> O NIA SO <br /> Subtotal Eantmcrks $579,408 51,257,384 f0 51,836,789 <br /> Rove oration Cosl $1.853 $704 $10646 $13.203 <br /> TOTALS 581,258 $1,258,088 $10,646 $1,349,992 <br /> Generic Material Hauling-Cover and Growth Media Costs <br /> Cover Placement Growth Media Placement <br /> Lover oral oral oral Corer w,h MMIa wth M-tl umber o1 olal oral oral Top-1 <br /> Description Racement Flee, NTrucks/t Total Fleet Lahm EquiDmenl Racemmt Growth Metlia GRacement ru Fleet NTrucksl Total Fleet Equ,pmenl TRacemem <br /> lrequiretll Cover Vdume Flee, R--ty Scrapers Ibura Gast Loat Volume Fleet Rotluctiv.ry Scrapers Hours Cost <br /> LCylhr f s Lfat L-1h, LSat Lis, S <br /> 1 Nonh Pit-Partial Ph Backlil 2,603 74019MG 546 2 $1 043 $3.238 E4.281 0 $0 $0 $0 <br /> 2 North Pit-Southeast Pit Wall But— 21.M7 74OM8G 629 5 34 $11 553 $36.890 $48.4a3 0 $01 $0 $0 <br /> 3 Squth P8-LantlsBde Slo a M4i alion haul 4 fit $0 $0 $0 0 $0 s0 50 <br /> 4 Ngnh PIl-Cover Material Stockpiling _ _ EO $O EO 0 $0 $D $0 <br /> 5 South P8-Cover Material Stock ihn $0 $0 $0 0 $0 $0 $0 <br /> 14000 3o E12.596 $10,138 552.724 0 EO <br /> Generic Material Hauling-Scarifying/Re vegetation Costs <br /> 0 <br /> -A anryiny p.ny ey <br /> PY-e xanly,ngr m mat <br /> Description 5— SRipp- Equ�pment Mpp,n9 LaeOart E9u9pmenl^ R MatH al^ Rete9etah. <br /> lregwretll Area Wura Coat Loat Loat Coal Loat hf5 <br /> c fa, cfat s S f f S <br /> 1 Nonh Pt-Panial Pit 8ac1011 161 $0 $0 $161 $61 $926 $1.148 <br /> 2 North PIl-Southeast Ph Wall Buttress 13.26 $0 $0 $1.326 $504 $7617 $9447 <br /> 3 South Pit-LaM.eSb M8i atbn ha.61 166 $0 $0 $ $366 $139 $2,10 $2.608 <br /> 4 Nonh Pit-Cover Material Stock ipn 0.10 $0 $0 $ $ $0 to $0 <br /> 5 South P8-Cover Material Stock iYn 0.10 $0 $0 $0 $0 so $ E <br /> 1874 $0 $0 f0 $1,953 $704 f10,848 513,203 <br /> Page 2 of 2 HOMESTAKE MINING COMPANY <br /> 65 of 164 <br />
The URL can be used to link to this page
Your browser does not support the video tag.