Laserfiche WebLink
Homestake Mining Company June 17,2019 <br /> Regular(112d)Operation Reclamation Permit Application Package <br /> 5.0 RECLAMATION COSTS <br /> 5.1. Reclamation Cost Estimate <br /> A summary of the reclamation costs by OU is presented in Table 5-1, and print outs from the <br /> detailed SRCE model is presented in Appendix C. Total combined reclamation costs for the site <br /> are estimated to be approximately $24.5 million USD (MUSD) . A surety bond of$2.2MUSD was <br /> previously posted in 1984 (HMC, 1984), and will need to be increased by$22.3MUSD to address <br /> the currently estimated. <br /> EXHIBIT L-RULE 6 4 12 (RECLAMATION COSTS)(Revised June 17,2019) Page 19 <br /> HOMESTAKE MINING COMPANY <br />