Laserfiche WebLink
As of April 2019 M2013-066 2019 Annual Report <br /> Rev 241un19 SOUTH PARCEL <br /> Map Description Acres Status Acres BF Grade Soil Seed <br /> A Well Pad (Perm/PreEx) 2.9 Not effected land- maintenance - not part of reclamation <br /> B Roads (Perm/PreEx) 2.3 Not effected land- maintenance - not part of reclamation <br /> C Industrial Areas Permanently zoned industrial <br /> C1 West Pad (HMA) 2.4 At final grade 2.4 2.4 2.4 <br /> C2 East Pad (timber) 0.9 At final grade 0.9 0.9 0.9 <br /> C3 North Pad (processing) 1.3 At final grade (see notes) 1.3 1.3 1.3 <br /> D Berm/Stockpile on Road 0.2 At final grade 0.2 0.2 0.2 0.2 <br /> E Southeast Pit Mining completed <br /> Fn Northwest Pond 1.9 With final configuration (see notes) 1.9 <br /> Fs Southeast Pond 2.8 With final configuration (see notes) 2.8 <br /> E- Remainder of SE Pit 12.7 At final grade, soiled, seeded 12.7 12.7 <br /> Summary of Areas(in acres) 27.4 22.2 0.0 0.2 4.8 17.S <br /> Highwalls NONE <br /> Note:Tasks listed are based on reclamation to be done immediately with no further mining. As mining <br /> continues (2019-2022), Areas to the West of the Permanent Roads may be mined. <br /> Excavation and shaping of ponds has been done without dewatering. Pond slopes 3:1 for at least 15 feet <br /> below normal water level. Water level in ponds rises and falls with river. <br /> Areas measured from April 2019 arial photos (courtesy FEMA) <br /> Placement of soil to include ripping of compacted surface. <br /> Seeding includes reseeding of entire 14.0 acres of Area E. <br />