Laserfiche WebLink
pF Cpl <br /> COLORADO DIV. gATION, MINING AND SAFETY <br /> * 187 * 1313 Sherman Str AME\mac orado 80203 ph(303)866-3567 RECEIVED <br /> -wva Ms�Si� JUN 2 5 2019 <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET <br /> File No.: M- 19T7-560 site Name:Rocky Ford East Pit DIVISION OFRECLA"A-M-al <br /> MItvINGAND SA] <br /> Otero 3 3 <br /> County TR# (DRMS Use only) <br /> Valco !r:C. <br /> Permittee. N o <br /> Operator(If Other than Permittee): <br /> Permittee Representative:To rn Brubaker <br /> Please provide a brief description of the proposed revision: <br /> Weed control plan and management plan, specific control measures to be applied, a schedule <br /> and a post treatment moniterinq pian. <br /> sQ� <br /> As defined by the Minerals Rules, a Technical Revision(TR) is: "a change in the permit or application 3 �d <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of permit amendment to make the, required or desired change-, <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be nntlfied of specific deficiencies that will need to lie. addressed. If at the end of the. 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 1 IOc, 111, 112 construction ❑ <br /> cam,�. ✓ <br /> materials, and 112 quarries <br /> 112 hard rock (not DMO) $175 ❑ <br /> 11Od, 112d(l, 2 or 3) $1006 ❑ <br />