My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-06-21_REVISION - M1980183
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980183
>
2019-06-21_REVISION - M1980183
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 11:12:42 AM
Creation date
6/21/2019 2:15:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980183
IBM Index Class Name
REVISION
Doc Date
6/21/2019
Doc Name
Request for Surety Reduction
From
Brannan Sand & Gravel
To
DRMS
Type & Sequence
SR2
Email Name
JLE
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> I'ask description. Reclaim Pit 29 — <br /> Site: Pit 29 Permit Action: AM02 1'errnit-Jobii: M 1980183 <br /> PROJECT IDENTIFICATION <br /> Task#: 999 State: Colorado Abbreviation: None <br /> Date: 7i24126)15 - County: Adams Filename: M183-999 <br /> User: TOD ---- <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description _ geed Si_7_e flours Cost <br /> 001 Grade all slopes in Areas I and 111 to 3 11:1 V or D07FR ? 474.02 $240,639.00 -- - <br /> flatter <br /> 002 Weed control,entire site RENEGE 1 24.00 S7,986.00 <br /> 003 Grade lines in mining area III D0717R 2 47.71 ^� S24,223.00 <br /> 004 Riprap banks cost from ANI-01) NA 1 40.00 $600,000.00 <br /> 005 Construct french drain(cost from AM-02) NA 1 160.00 $147,500.00 <br /> 006 Revegetation of entire Site RENEGE. 1 165.00 S58,527,00 <br /> 007 Mobil ization/DemobiIization MOBILIZE 1 4.88 $4,946.00 <br /> SUBTOTALS: 915.61 $1,083,821 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Iiabilityinsurance: 2.021ro Total- $21,893.1S <br /> Performance bond: 1.050/.) Total= $i 1,380.12 <br /> Job superintendent: 200.00 hrs Total= $1.5,032.00 <br /> Profit: 10.00% Total S108,382.10 <br /> TOTAL.O& P- $156.687.40 - - <br /> CONTRAC I'AMOUNT idirect • 0& P)= S1,240,508.40 <br /> LEGAL- FNGINEE'sRING-PROJECT MANAGEMENT: <br /> Financial warranty processing f legal/related costs): 500.00 Total- 500.00 <br /> Engitiecring work andior eontracu"bid preparation: 6.00% Total= S74,430.50 <br /> Reclamation managenicnt and/or administration: 5.00% - Ss62,025.42 _� <br /> CONTINGENCY: 0.00 Total= S0.00 <br /> TOTAL,INDIRECT COST= S293,643.32 <br /> TOTAL 13OND AMOUNT(direct+indirect)= $1,377,464.32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.