Laserfiche WebLink
Table L-1 Reclamation Task and Cost Estimate (Phase 1) <br /> Activity Description Time(Months) Cost($) <br /> Remove truck scale 0.5 3000 <br /> Topsoilings of all disturbed areas 3.0 36300 <br /> Revegetation of disturbed areas.Includes seeding and mulching. 6.0 21000 <br /> Slope armoring in Pit 4 where the 100-YR floodplain covers 1.0 14810 <br /> Subtotal $75,110 <br /> DRMS Costs(28%x direct costs) $21,031 <br /> Total Bond Amount 10.5 $96,141 <br /> Birdseye Pit Grey;1 rwivk3 and\sw,rutm PI 1 <br /> June 2019 L-2 <br />