Laserfiche WebLink
© COLORADO <br /> Division of Reclamation, <br /> Mining and Safety <br /> Department of Natural Resources <br /> 1313 Sherman Street, Room 215 <br /> Denver,Colorado 80203 <br /> June 7, 2019 <br /> Peter Wayland <br /> Weiland, Inc. <br /> PO Box 18087 <br /> Boulder CO 80308 <br /> Re: Preliminary Review of a 112 Construction Materials Reclamation Permit Application Package, <br /> Coulson Excavating,Amen Aggregate,Permit M2019-025 <br /> Mr. Wayland: <br /> The Division of Reclamation, Mining, and Safety has completed its preliminary adequacy review of your 112 <br /> construction materials reclamation permit amendment application. The application was called complete for review <br /> on May 17, 2019. All comment and review periods began on May 17, 2019. The decision date for this <br /> application is August 15,2019. Please be advised that if you are unable to satisfactorily address any <br /> concerns identified in this review before the decision date,it will be your responsibility to request an <br /> extension of the review period. If there are outstanding issues that have not been adequately addressed <br /> prior to the end of the review period, and no extension has been requested,the Division will deny this <br /> application. In order to allow the Division adequate time to review your responses to any adequacy issues, <br /> please submit your adequacy responses to the Division no later than one week prior to the decision date <br /> (August 8, 2019). <br /> Please note that any changes or additions to the application on file in our office must also be reflected in the <br /> public review copy, which has been placed with the Weld County Clerk and Recorder. <br /> The review consisted of comparing the application content with specific requirements of Rule 6.1, 6.2, 6.4 and 6.5 <br /> of the Minerals Rules and Regulations of the Colorado Mined Land Reclamation Board for the Extraction of <br /> Construction Materials. As with most applications,there are items that will require clarification of the existing <br /> information. Any inadequacies are identified under the respective exhibit heading. <br /> EXHIBIT D- Mining Plan (Rule 6.4.4): The mining plan shall supply the following information, correlated <br /> with the affected lands, map(s) and timetables: <br /> (a) description of the method(s)of mining to be employed in each stage of the operation as related to any surface <br /> disturbance on affected lands; <br /> (b) earthmoving; <br /> (c) all water diversions and impoundments; and <br /> 1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http://mining.state.co.us <br /> Jared Polis, Governor I Dan Gibbs, Executive Director I Virginia Brannon, Director <br />