My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-06-04_REVISION - M2018048
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2018048
>
2019-06-04_REVISION - M2018048
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 9:34:21 AM
Creation date
6/4/2019 2:30:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2018048
IBM Index Class Name
REVISION
Doc Date
6/4/2019
Doc Name
Request for Technical Revision
From
SEMA Construction
To
DRMS
Type & Sequence
TR1
Email Name
PSH
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May 28, 2019 <br /> '-N �5E11� <br /> 7r <br /> Colorado Division of Reclamation Mining and Safety <br /> Attn: Mr. Peter Hays <br /> 1313 Sherman Street, Room 215 <br /> Denver, Colorado 80016 <br /> Re: Betz Borrow Pit, File No. M-2018-048, 111 Construction Materia1VgV&4*fflU Utt' <br /> Permit April 9, 2019 Inspection Report Response <br /> Dear Mr. Hays, <br /> On May 7, 2019, the Division of Reclamation, Mining and Safety(DRMS) provided its <br /> Inspection Report from the April 9, 2019 Inspection to SEMA Construction, Inc., concerning <br /> the Betz Borrow Pit, File No. M-2018-048, 111 Construction Materials Reclamation Permit. <br /> This response will address the DRMS Inspection Findings and Correction Actions. <br /> Respectfu y, <br /> Mr. Cameron Man ,EMA Construction, Inc. <br /> End: <br /> 1. Request for Technical Revision Form with Check for required TR Fees <br /> 2. Revised Mining Map showing Technical Revision Modifications <br /> 3. Photographic Documentation of Required Signs and Markers <br /> Following are our responses to the Division's adequacy questions: <br /> Problem 1: <br /> The current Mining Plan needs to be updated and clarified pursuant to C.R.S. 34-32.5-112 <br /> (1)(c)(VI). The Operator must provide sufficient information to describe or identify how the <br /> Operator intends to conduct the operation. <br /> Corrective Action 1: <br /> The Operator shall submit a Technical Revision pursuant to Rule 1.9, with the required$216 <br /> revision fee, to update and clarify the approved Mining Plan to reflect existing and proposed <br /> activities by the corrective action date. <br /> Response: <br /> A request for Technical Revision to the approved Mining Plan is included. Additionally, the <br /> updated Mining Map which reflects the Technical Revisions has also been included with this <br /> response. <br /> REQUESTED REVISION: <br /> Current Approved Mining Plan: <br />
The URL can be used to link to this page
Your browser does not support the video tag.