My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-04-29_PERMIT FILE - C1981019A (6)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2019-04-29_PERMIT FILE - C1981019A (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2020 3:10:24 PM
Creation date
5/31/2019 7:57:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
4/29/2019
Section_Exhibit Name
2.05 Operations and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RULE 2 PERMITS <br /> x. •.'Vjx3p!ACtl%.`-r 01'ig t0 .+tFs i:e N.wr:'4fl'R4^;3`A-1§+'6Y-uWA3Y<'r uh 'vt':aP..�\+:dp\d.M eJ b*f3NP3}3?aiJ\'qW4. At}Ry,'1F•+##f MW`4p`Ae46fPFx &+Ml`W. .W'" -W <br /> The storage facility is in compliance with all requirements of the Mine Safety and Health <br /> Administration, Bureau of Alcohol, Tobacco and Firearms and the Colorado Division of Mines. <br /> Loadout <br /> Colowyo's loadout, the Gossard Loadout, is located at the end of the Union Pacific rail line. The <br /> only segment of the spur within the permit area is shown on Map 22A, Existing Structures North. <br /> Power Lines <br /> Because Colowyo utilizes many electric-powered mining machines, a network of electric power <br /> lines is located in the permit area to supply electricity to the equipment. The locations of the <br /> Colowyo power lines are shown on the Existing Structures Maps (Map 22A and Map 22B). <br /> Electrical power lines located in the permit area will be constructed in accordance with requirement <br /> of Section 4.18 to minimize potential electrical hazards to large raptors. <br /> A right of way from the BLM and the Colorado State Land Board was granted for the existing Tri- <br /> State 138kV running along the eastern portion of the permit boundary. The right of way includes <br /> a fifty-foot corridor on either side of the powerline detailed on the Existing Structures Map (Map <br /> 22A and Map 22B). This permanent transmission line will stay in place after final bond release, <br /> as it is owned and maintained by Tri-State. The approximate acreage of this right of way is 7.748 <br /> acres. Please see Volume 2A, Exhibit IA. <br /> Three major pieces of equipment at Colowyo, two draglines, and one shovel are powered by <br /> electricity. Therefore, during the life of the mine it is necessary to periodically move the existing <br /> power line loop to accommodate the advancement of the pit. The location of the anticipated power <br /> line loop changes are also- shown on Map 22B, Existing Structures. <br /> In addition to power poles and lines, Colowyo will be using power cable to connect to the <br /> equipment that requires electricity (ie. Shovel, draglines, highwall miner, etc.). This is a rubber <br /> coated electrical cord that is used to run on top of the ground to convey electrical power from the <br /> substation to the electrical operated equipment for mining. If the corridor for the cable is covered <br /> with brush, making it inaccessible by a light vehicle, then the surface brush will be removed as a <br /> minimum. If not then the power cable will be placed over the surface without additional <br /> disturbance. In most cases topsoil will not be removed or salvaged due to the minimal impact to <br /> the environment. However, if necessary, the topsoil will be salvaged in either a windrow, <br /> stockpile, or placed on a regraded area ready for topsoil placement. The corridor of disturbance <br /> will generally be a dozer blade wide or approximately 25 feet. This allows for the cable equipment <br /> to access the corridor for placement and retrieval of the power cable. In addition this allows for <br /> small vehicle access for any maintenance activity that may arise. <br /> Along the western limits of the west pit operations, highwall mining activities will be conducted <br /> under the existing Tri-State power lines. Colowyo will be responsible for impacts to the power <br /> Rule 2 Permits 2.05-9 Revision Date: 3/25/19 <br /> Revision No.: MR-200 <br />
The URL can be used to link to this page
Your browser does not support the video tag.