Laserfiche WebLink
May 20, 2019 C-1980 -007/West Elk Mine LDS <br /> <br />Number of Partial Inspection this Fiscal Year: 8 <br />Number of Complete Inspections this Fiscal Year: 4 <br /> <br /> Page 3 of 8 <br /> <br />east. It was anticipated that the armored swale where the haul road crosses onto the pile itself will be constructed <br />in the autumn of 2019. <br /> <br />SLIDES and DAMAGE - Rule 4.12: <br /> MCC’s monitoring of the slumped area on the Material Storage Bench (MSB) showed that the area was <br />continuing to move steadily at a rate of about 1/2” per day. The cracks on the surface of the bench had widened <br />noticea bly since the last inspection. <br /> <br />DOCUMENTS RECEIVED <br />N/A <br />OTHER (SPECIFY) <br />N/A <br /> <br /> <br />ENFORCEMENT ACTIONS/COMPLIANCE <br /> <br />No enforcement actions were initiated as a result of this inspection, nor are any pending. <br />