Laserfiche WebLink
NOTES LEGEND <br /> GENERAL NOTES: <br /> 1. THIS DRAWING SET IS BASED ON INFORMATION PROVIDED BY OTHERS.ALL LOCATIONS ARE BELIEVED TO BE ACCURATE.AJAX IS PROPERTY BOUNDARY GEOLOGIC LEGEND <br /> NOT RESPONSIBLE FOR THE ACCURACY OF THE DRAWINGS OR THE DESIGN CALCULATIONS USED TO SUPPORT THE DESIGNS TOPOGRAPHY BOUNDARY INTRUSIVE QUARTZ MONZONITE PORPHYRY OR SIMILAR <br /> CONTAINED HEREIN. TI EXISTING TOPOGRAPHY ROCK:SILLS INTRUDED INTO PALEOZOIC SEDIMENTS ARE <br /> THE MOST COMMON FORM OF OCCURRENCE. <br /> 2. BASE TOPOGRAPHY PROVIDED BY FMI-CLIMAX.TOPOGRAPHY INSIDE DASH-DOT LINE FROM 2016 AERIAL.TOPOGRAPHY OUTSIDE PAVED ROAD © MINTURN FORMATION:PREDOMINANTLY THICK SEQUENCES <br /> DASH-DOT LINE FROM 2006 AERIAL. UNPAVED ROAD QUARTZZITE ITS AR SANDSTONE LOCALLY METAMORPHOSED TO <br /> QU NEAR INTRUSIVE QUARTZ MONZONITE <br /> — TRAIL <br /> PORPHYRY. <br /> 3. HISTORIC MINING ACTIVITY LOCATIONS PROVIDED BY AECOM(legacy URS)3125/13.LOCATIONS ARE APPROXIMATE AND FIELD FENCE LINE / MIXED FACE:INCLUDES BOTH QUARTZ MONZONITE AND <br /> SURVEY HAS NOT BEEN PROVIDED FOR VERIFICATION OF MINING ACTIVITY. PRECAMSRvw QUARTZITE ORHORNFELS DEPOSITS: <br /> -- -- NATURAL DRAINAGE UNDIFFERENTIATED QUATERNARY ALLUVIUM,TILL,AND <br /> 4. BEDROCK STRUCTURE AND SURFACE GEOLOGY INTERPRETED BY AECOM(legacy URS). EXISTING LAKE/POND Ua_fa COLLUVIUM. <br /> -- -- / <br /> 5. MASTER SURVEY PLAT OVERLAY IS AN APPROXIMATE LOCATION AND FIELD SURVEY HAS NOT BEEN PROVIDED FOR VERIFICATION ONSITE DRAINAGE APPROXIMATE FAULT LOCATION <br /> OF LOCATION OF MINING CLAIM OR MINING ACTIVITY. PROCESS WATER POND <br /> »1»»»>>> DRAINAGE DITCH PROJECTED FAULT AREA <br /> 6. NOTES FOR THE HISTORIC MINING CLAIMS DEPICTED ON THE MASTER SURVEY PLAT WERE PROVIDED BY THE BLM TO AECOM <br /> (legacy URS)OCTOBER,2011. CULVERT <br /> Elo BUILDINGS/STRUCTURES <br /> 7. REVISED GROUND REINFORCEMENT PLANS,DETAILS AND ENGINEERING CALCULATIONS FOR GROUND SUPPORT <br /> CLASSIFICATIONS PROVIDED BY LANGSTON&ASSOCIATES TO CLIMAX AND HENDERSON DURING PHASE I TUNNELING Q POWER POLE <br /> OPERATIONS.REFINEMENTS TO THE GROUND SUPPORT PLANS AND DETAILS ARE REQUIREMENTS OF CLIMAX MOLYBDENUM Q BOLLARD <br /> CORPORATION. PHASE 1 TUNNEL(COMPLETE) <br /> PHASE 2 TUNNEL ALIGNMENT <br /> PHASE 3 TUNNEL ALIGNMENT <br /> q q Cq Cq HAUL ROUTE(VARIOUS) RMR L E G E N D <br /> ® EX.MUCK DISPOSAL LOCATION <br /> —OE—OE—OE— ACTIVE OVERHEAD ELECTRIC 0 RMR - CLASS I <br /> —UE--UE—UE— ACTIVE BURIED ELECTRIC <br /> GAS ACTIVE BURIED NATURAL GAS ® RMR - CLASS I I <br /> --Or ACTIVE OVERHEAD COMM. <br /> ur ACTIVE BURIED COMM. <br /> 0 RMR CLASS III- <br /> —PO—F0— ACTIVE BURIED FIBER OPTIC 0 RMR - CLASS IV <br /> -O•O•O•O- SPILING PROFILE <br /> wwwrwww•w•n WELDED WIRE MESH RMR - CLASS V <br /> f it TUNNEL ROCK(TYPICAL) <br /> � RMR- CLASS VI <br /> ©a TUNNEL SHOTCRETE LINING <br /> ® WOOD BLOCKS/CRIBBING <br /> ® SPLIT SET BOLT-7FT NOTES.- <br /> INFLATABLE BOLT-7 FT 1. TUNNEL PROFILE VERTICAL SCALE EXAGGERATED. <br /> INFLATABLE BOLT-12 FT 2. GEOLOGIC CONTACTS AND FAULT LOCATIONS ARE <br /> APPROXIMATE <br /> x APPROXIMATE LOCATION OF HISTORIC SHAFT OR <br /> CUT BASED ON BLM FIELD NOTES <br /> APPROXIMATE LOCATION OF TUNNEL <br /> APPROXIMATE LOCATION OF VERTICAL <br /> TH-10 TEST HOLE(AECOM,2011) <br /> APPROXIMATE LOCATION OF INCLINED <br /> TH-12a TEST HOLE(AECOM,2011) <br /> TP01 APPROXIMATE LOCATION OF TEST PIT <br /> ® (AECOM,2011) <br /> MGM <br /> 12-02 - APPROXIMATE LOCATION OF INCLINED <br /> TEST HOLE(HENDERSON,2012) <br /> MGM APPROXIMATE LOCATION OF VERTICAL <br /> c '•sFo <br /> 12-01 TEST HOLE(HENDERSON,2012) <br /> 7 <br /> ?z 43648 <br /> -o <br /> Q S%W_E`G <br /> DESIGNED -VISION <br /> WARNING VARIOUS <br /> OPPWN RLM CLIMAX MINE Z2 <br /> DL <br /> CHECKED - --- - -M- PROJECT NO. <br /> ISSUED FOR CONSTRUCTION FILM 4119 Octimax Molybdenum DE REVIEWED AJH MAYFLOWER FLOOD BYPASS TUNNEL SYSTEM 12235 <br /> 1 ISSUED FOR BID FILM 10118 IF THIS BAR DOES vc <br /> A A pat-Mcllaft CoM NOTMEASURET' aer MFT-C-02 <br /> 4 0 ISSUED FOR CLIENT REVIEW FILM S18 PROJECT B CONSTRUCTION MANAGEMENT THEN DRAWING IS MM/RV LEGEND AND GENERAL NOTES <br /> DESCRIPTION OF REVISION BY 047E M$/19 <br /> ENGINEERING,GEOLOGY,SURVEYING NOT TO SCALE are S-EE_ 1 <br /> oREV <br />