My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-05-24_PERMIT FILE - M2019028 (11)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2019028
>
2019-05-24_PERMIT FILE - M2019028 (11)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2025 5:56:19 AM
Creation date
5/28/2019 8:31:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019028
IBM Index Class Name
PERMIT FILE
Doc Date
5/24/2019
Doc Name
Application
From
J-2 Contracting Co.
To
DRMS
Email Name
ECS
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Reclamation Measures/Materials Handling <br /> Backfilling will be done to provide stabilized shorelines around the reservoir and to minimize <br /> erosion. The backfill material will consist of gravel, overburden, and topsoil. There will not be <br /> known toxic or hazardous materials in the backfill material. Additionally, it is not likely that acid <br /> forming or toxic materials will be encountered during mining. The mining will not leave high walls <br /> on the property. In addition, there will be no auger holes, excavations, or shafts left on the <br /> property. <br /> Overburden that is not used for production of road base and topsoil that is removed during the <br /> mining will be used to reclaim the mining slopes and areas that are disturbed during the mining <br /> such as haul/access roads and recharge pond areas. Overburden will be placed in the areas <br /> such as haul/roads and the recharge pond areas to bring the grade to the final reclaimed <br /> elevation. Topsoil will then be placed to finalize the grading such that seeding can occur. The <br /> topsoil will be placed at all disturbed areas and on the mining slope to an elevation matching the <br /> expected reservoir water level. <br /> Topsoiling <br /> Approximately the top twelve inches of soil on the property is classified as topsoil. This layer <br /> includes the root zone of grasses and crops, which will be stripped and stockpiled separately. <br /> By using concurrent reclamation techniques, the topsoil is not expected to remain in stockpiles <br /> for more than one to five years. If the stockpile remains more than one growing season, it will be <br /> seeded with a fast-growing vegetative cover to prevent erosion. All topsoil will be retained on- <br /> site to reclaim the reservoir shoreline, and other areas disturbed by mining activities. Where <br /> required, topsoil will be replaced to a depth of twelve inches. <br /> Revegetation <br /> As mining operations are completed, areas for reclamation will be graded and shaped for <br /> revegetation. Runoff or excess water from adjacent areas will not be allowed to flow over slopes <br /> being graded and seeded. If needed, berms or channels will be constructed to divert excess <br /> water and convey it in a safe and non-erosive manner. <br /> For disturbed areas, the reclamation plan includes re-vegetating with appropriate seed mixes to <br /> minimize erosion and re-establish natural terrain. The seed mixture below was selected to be <br /> long lasting and regenerating, as recommended by the Greeley Natural Resource Conservation <br /> Service Office (see attached recommendation). The ground will be fine graded prior to seeding <br /> and mulch will be applied according to recommendations from the NRCS. Reservoir side slopes <br /> below the anticipated reservoir water level will not be seeded. The proposed seed mix is shown <br /> in the following table. <br /> � <br /> ►&T Consulting,Inc. J-2 Contracting Company' DPG Mining Site <br /> DRMS 112 Permit Application <br />
The URL can be used to link to this page
Your browser does not support the video tag.