My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-05-24_PERMIT FILE - M2019028 (11)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2019028
>
2019-05-24_PERMIT FILE - M2019028 (11)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2025 5:56:19 AM
Creation date
5/28/2019 8:31:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019028
IBM Index Class Name
PERMIT FILE
Doc Date
5/24/2019
Doc Name
Application
From
J-2 Contracting Co.
To
DRMS
Email Name
ECS
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT E <br /> Reclamation Plan <br /> Lined water storage reservoirs will be the final reclaimed use for the DPG Mining site. Portions <br /> of mining areas will be reclaimed as "native" areas, which will be re-seeded with native <br /> vegetation. The majority of the mining areas will be reclaimed as water storage reservoirs. The <br /> remaining area within the proposed permit boundary will consist of reservoir shoreline, <br /> unimproved access roads around the reservoirs, and reclaimed or otherwise undisturbed land. <br /> Final Land Use Reclamation <br /> Plan Area <br /> acres <br /> Reservoir Water Surface 176.80 <br /> Access Roads 21.56 <br /> Reclaimed Vegetated Land and Undisturbed 29.66 <br /> Land <br /> TOTAL 228.02 <br /> Water Storage Reservoir <br /> In general, the mining limits will be mined down to the shale/claystone/sandstone bedrock. The <br /> relatively impermeable bedrock will make the bottom of the reservoir. The reservoir will be <br /> separated from the surrounding alluvial aquifer by the slurry wall liner system as detailed in the <br /> cross-section shown on the Reclamation Plan Map. The slurry wall liner will be keyed into the <br /> bedrock material and extend upward through the entire height of the alluvium. Design <br /> specifications and quality control procedures used during the construction of the slurry wall liner <br /> will ensure that the reservoir meets the State Engineer's Office (SEO) performance standards <br /> for permeability. The slurry wall is anticipated to be installed around the perimeter of Phase 1 <br /> and 2 after a depth of 30 feet is reached in Phase 1 and prior to starting mining in Phase 2 and <br /> it is expected minimal dewatering will be required in the subsequent phases due to the slurry <br /> wall cutting off groundwater infiltration into the pit. <br /> All reservoir slopes will be reclaimed to at least 3H:1 V final grade Since reclamation will be <br /> concurrent with mining, most soil, overburden, and bedrock material excavated during mining <br /> will be used almost immediately. Scrapers and dozers and compactors will be used to shape the <br /> reclaimed slope material along the reservoir perimeters to achieve the final grade. Upon placing <br /> the backfill material, 95 percent compaction will be achieved to ensure adequate integrity of <br /> backfilled areas for haul/access roads and recharge pond areas that are not within the future <br /> water storage/reservoir footprint. Final reclamation by capping with topsoil and re-vegetating <br /> above the expected reservoir water level will follow grading operations as well as backfilled <br /> areas that will not be haul/access roads to minimize the amount of disturbance at any one time. <br /> During reclamation activities, inlet and outlet facilities for the reservoir will be designed and <br /> installed once the operational criteria of the proposed reservoir have been identified by an end <br /> user. <br /> J-2 Contracting Company <br /> J&T Consulting,Inc. <br /> �' DPG Mining Site <br /> DRMS 112 Permit Application <br />
The URL can be used to link to this page
Your browser does not support the video tag.