Laserfiche WebLink
MINING PLAN EXHIBIT D(CONT) <br /> MINING TIMETABLE <br /> The continuing uncertainty of economic conditions in the <br /> construction materials industry precludes an accurate forecast of <br /> demand for materials during the life of the mine . We therefore, <br /> can only estimate the mining timetable based on an average year <br /> and may expect a specific year to vary widely from the average . <br /> ACRES <br /> +_ <br /> AREA* YEARS TOTAL MINED MISC (I.E. <br /> AREA SETBACKS AND <br /> UNDISTURBED, <br /> ETC. ) <br /> Area 1 1-2 12.49 9.31 3 .18 <br /> Area 2 2-4 34 .89 28.49 5.13 <br /> Area 3 12-14 122.77 114.65 7.13 <br /> Area 4 1-3 18.07 14 .97 2 .81 <br /> Area 5 15-17 156.66 145.49 8 .76 <br /> TOTALS 31-40 344.88 312.91 27.01 <br /> * areas are only used to explain the mining areas,not the direction or timing of <br /> the mining operations. <br /> 5 <br />