Laserfiche WebLink
May 14, 2019 C-2009-087/Peabody Sage Creek Mine TNL <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 1 <br />Number of Complete Inspections this Fiscal Year: 4 <br /> <br /> Page 3 of 5 <br /> <br /> A gully has formed on the pad near the water tank that needs to be repaired and the pad ditch cleaned. <br /> An erosional feature has formed above the portal at the ditch from the pad to the smart ditches. <br /> The pad above the portal needs to be cleaned up, and ditches reestablished <br /> Portal sump number 1 needs to be reestablished <br /> An erosional feature has formed off the warehouse pad that needs to be repaired <br /> Items need to be removed from ditch past disturbance markers off the warehouse pad. <br /> Trash rack needs to be repaired and veg cleared at the Lower Sump <br /> Culverts at office need to be cleared <br /> Animal holes need to filled at the Pond 3 embankment <br /> <br /> <br /> <br />DOCUMENTS RECEIVED <br />OTHER (SPECIFY) <br /> <br /> <br />ENFORCEMENT ACTIONS/COMPLIANCE <br /> <br />No enforcement actions were initiated as a result of this inspection, nor are any pending. <br /> <br />PHOTOGRAPHS <br /> <br /> Gully near water tank Gully above smart ditches Reestablish ditch at portal <br />