Laserfiche WebLink
EXHIBIT D-Reclamation Plan <br /> Rule 6.3.4(Starts on Page 139 of the Rules) <br /> The purpose of the Reclamation Plan is to describe the timing, procedures, criteria and materials that will be <br /> used to reclaim the affected land to the proposed post-mining land use. Reclamation is required for all affected <br /> lands. This plan must be correlated to Exhibit E -Map. <br /> 1) Primary future(Post-mining)land use(check one): <br /> Cropland(CR) 1. Pastureland(PL) General Agriculture (GA) <br /> Rangeland(RL) FV1 Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) 11 Recreation(RC) Industrial/Commercial (IC) <br /> 2) Please provide a general description of how the mined area will be Reclaimed: <br /> Each excavation will be backfilled with stockpiled material. Stockpiled topsoil will then be spread over <br /> all disturbedareas. Mulch be incorporated at forest service specs. Forest approved seed mix will e <br /> cast and raked in. water diversion structures made four downed woody debris and rock will be placed <br /> 3) What will the final grade of the reclaimed slopes (Horizontal:Vertiical): 5 H: 1 V <br /> (Note: If the Applicant proposes slopes steeper than 3H: IV (example 1H:1V, 2H: 1V,etc.),please <br /> include a justification: <br /> a. Please provide a general description of the backfilling and grading: <br /> Material is placed back into the excavation by the backhoe and then contoured to the natural <br /> surroundings with the backhoe blade., <br /> 4) De th of topsoil to be salvaged (only for surface disturbances) (check one): <br /> 4-6 inches 6-8 inches <br /> 8-10inches 10-12inches <br /> ✓ Other: 0-3 in site# 1. 3-6in. site#2 <br /> N/A, explain: <br />