My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-05-22_PERMIT FILE - M2019026
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2019026
>
2019-05-22_PERMIT FILE - M2019026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 1:03:37 PM
Creation date
5/22/2019 2:31:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019026
IBM Index Class Name
PERMIT FILE
Doc Date
5/22/2019
Doc Name
Application
From
Michael Royer
To
DRMS
Email Name
ERR
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D-Reclamation Plan <br /> Rule 6.3.4 (Starts on Page 139 of the Rules) <br /> The purpose of the Reclamation Plan is to describe the timing, procedures, criteria and materials that will be <br /> used to reclaim the affected land to the proposed post-mining land use. Reclamation is required for all affected <br /> lands. This plan must be correlated to Exhibit E-Map. <br /> 1) Primary future(Post-mining) land use(check one): <br /> Cropland(CR) Pastureland(PL) General Agriculture (GA) <br /> Rangeland(RL) Forestry (FR) Wildlife Habitat (WL) <br /> Residential(RS) Recreation (RC) Industrial/Commercial (IC) <br /> 2) Please provide a general description of how the mined area will be Reclaimed: <br /> each excavation wil be backfilled with stockpiled material. Stockpiled topsoil will then be spread over <br /> the disturbed area. Forest approved seed mix will be cast and raked in.Any woody debris and rocks <br /> will hp placpd to prPVPnt Prncinn_ <br /> 3) What will the final grade of the reclaimed slopes(Horizontal:Vertical): 5 H: 1 V <br /> (Note: If the Applicant proposes slopes steeper than 3H: 1 V(example 1H:1 V,2H: 1 V,etc.),please <br /> include a justification: <br /> a. Please provide a general description of the backfilling and grading: <br /> 4) De th of topsoil to be salvaged (only for surface disturbances) (check one): <br /> 4-6 inches R 6-8 inches <br /> 8-10 inches 10-12 inches <br /> ✓ Other: 0-3 in Site#1 3-6in site#2 <br /> F__J_ N/A,explain: <br />
The URL can be used to link to this page
Your browser does not support the video tag.