Laserfiche WebLink
Mr. Peter Mays, DRMS <br /> May 17,2019 <br /> (e) The excavation necessary to investigate the cause commenced on May 15. <br /> Approximately 8 feet below the surface a 2" HDPE pipeline connected to MLEX-5 was <br /> leaking at the pitless adapter due to a misalignment between the pipe and the well. Most <br /> of the flow was kept in the pipeline but a small amount was leaking from this location. At <br /> this time MLEX-5 remains powered off, while an engineered solution is implemented. <br /> Currently, this consists of determining an appropriate flexible connection that could be <br /> used in this application, installing it, and returning the well to operation. <br /> If you have any additional questions or concerns, please feel free to contact me at 720-942-3420 or Miguel <br /> Hamarat at 720-942-3255. <br /> Sincerely, <br /> 4"' <br /> Aaron Hilshorst <br /> Chief Environmental Engineer <br /> Climax Molybdenum Company <br /> Henderson Operations <br /> CC (via email): <br /> M. Hamarat, Climax <br /> Page 2 <br />