My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-05-16_REVISION - M1983194 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983194
>
2019-05-16_REVISION - M1983194 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 9:27:08 AM
Creation date
5/17/2019 2:16:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983194
IBM Index Class Name
REVISION
Doc Date
5/16/2019
Doc Name
Request for Technical Revision
From
Natural Soda LLC
To
DRMS
Type & Sequence
TR43
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17H-IR-E Well Drilling and Completion Information 00 <br /> 0.0' -133.3' MD KB; 0.0'-120.0' MD GL: 26.0" conductor hole 6000 <br /> 0.0' -133.3' MD KB; 0.0'-120.0' MD GL: 16.0" OD x 15.25" ID; (J-55, 62.64lb/ft) conductor casing, cemented to surface <br /> 06 <br /> 133.3'-1314.6' MD KB; 120.0'-1301.3' MD GL: directionally drilled 13.5" vertical intermediate hole to KOP 5900 <br /> 1314.6'-2390.0' MD KB; 1301.3'-2376.7' MD GL: directionally drilled 13.5" curved intermediate hole to casing point <br /> 0.0'-2390.0' MD KB; 0.0'-2376.7' MD GL: installed 9.625" OD x 8.921" ID (J-55, 36.0 Ib/ft) intermediate casing installed from surface, Centek centralizers every 40-160 ft 58001 <br /> 1503.3' MD KB; 1490.0' MD GL: install Weatherford 9.625" ACP & DV tool <br /> 0.0'-2390.0' MD KB; 0.0'-2376.7' MD GL: intermediate casing cemented to surface °° <br /> 5700 <br /> 2390.0'-3925.2' MD KB; 2376.7'-3911.9' MD GL: directionally drill 8.75" horizontal hole in UBB& LBB <br /> 2143.6'-3543.6' MD KB; 2130.3'-3530.3' MD GL: install 7.0" OD x 6.366" ID LTC and FJ casing; install KLX hanger at 2130.3' MD GL(DS) <br /> Plug and Abandon 5601 <br /> 2141.6' MD KB; 2128S MD GL: set Cast Iron Bridge Plug (CIBP) <br /> 0.0'-2141.6' MD KB; 0.0-2128.3' MD GL: cement plug to surface 5500 <br /> 13.5"dia. Intermediate Hole Path <br /> 120.0-1301.3 MD GL <br /> 1300 <br /> Kick-Off Point i 540° <br /> 1301.6MDGL <br /> 8.5°/100'Build Rate <br /> 1400 <br /> 5300 <br /> DV/ACP Tool�S <br /> -1490.0 MD GL °p <br /> t 5200 <br /> Measured Depth (GL)-16()o <br /> 5100 <br /> Intermediate Hole Drill Path <br /> 13.5 dia., 8.5 /100 Build Rate <br /> 1301.6-2376.7 MID GL <br /> TD in Lower UBB ' <br /> goo <br /> 9.625" OD x 7.0" ID 5000 <br /> KLX Liner Hanger ✓i <br /> Production Liner -2130.3 MD GIL ,9 ��Cement to Surface <br /> 7.00" OD x 6.366" ID Production Hole Drill Path Intermediate Casing Install at DS °0 0.0-2128.3 MD GL <br /> LTC and FJ Steel 8.75"dia. Directional Hole 9.625"OD x 8.921" ID; J-55, 36.0 Ib/ft <br /> 2130.3-3530.3 MD GL 2376.7-3911.9 MD GL 0.0 23 6.7 Mb GL Coupling OD �,0 4900 <br /> Landed Casing in Lower UBB N <br /> 4�� <br /> TD 4800 <br /> Dissolution Surface <br /> 3911.9 MD GL <br /> Cast Iron Bridge Plug <br /> 400'Open Holef -2128.3 MD GL <br /> West East 4700 <br /> Natural Soda LLC <br /> 17H-IR-E Well Prognosis - P&A <br /> Section 36, T1S, R98W Rio Blanco County, CO <br /> Daub&Aasociates,W.�> `�� -- <br /> _ ���_. Date:May 14,2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.