My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-05-16_REVISION - M1983194 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983194
>
2019-05-16_REVISION - M1983194 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 9:27:08 AM
Creation date
5/17/2019 2:16:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983194
IBM Index Class Name
REVISION
Doc Date
5/16/2019
Doc Name
Request for Technical Revision
From
Natural Soda LLC
To
DRMS
Type & Sequence
TR43
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
700 <br /> 16H-IR-E Well Drilling and Completion Information <br /> 0.0' -133.3' MD KB; 0.0'-120.0' MD GL: 26.0" conductor hole 6000 <br /> 0.0' -131T MD KB; 0.0'-120.0' MD GL: 16.0" OD x 15.25" ID; (J-55,62.64 Ib/ft) conductor casing,cemented to surface 800 <br /> 133.3'-1330.4' MDKB; 120.0'-1317.1' MDGL: directionally drilled 13.5" vertical intermediate hole to KOP <br /> 1330.4'-2373.3' MD KB; 1317.1'-2360.0' MDGL: directionally drilled 13.5" curved intermediate hole to casint point 5900 <br /> 0.0'-2373.3' MD KB; 0.0'-2360.0' MD GL: installed 9.625" OD x 8.921" ID(J-55, 36.0 Ib/ft) intermediate casing installed from surface, Centek centralizers every 40-160 ft 900 <br /> 1488.4' MD KB; 1475.1' MD GL: install Weatherford 9.625" ACP& DV tool GL: 6724.6' <br /> 0.0'-2373.3' MD KB; 0.0'-2360.0' MD GL:intermediate casing cemented to surface 5800 <br /> 1000 <br /> 2373.3'-3864.1' MD KB;2360.0'-3850.8' MD GL: directionally drill 8.75" horizontal hole in UBB <br /> 2136.5'-3464.1' MD KB;2123.2'-3450.8' MD GL: install 7.0" OD x 6.366" ID LTC and FJ casing; install KLX hanger at 2123.2 MD GL(DS) 5700 <br /> Plug and Abandon 1100 <br /> 2144.6' MD KB; 2131.3' MD GL:set Cast Iron Bridge Plug(CIBP) <br /> 0.0'-2144.6' MD KB; 0.0-2131.3' MD GL:cement plug to surface _ 5600 <br /> Intermediate Hole Drill Path 1200 <br /> 120.0-1317.1 MD GL- <br /> ssoo <br /> Kick-Off Point 1300 <br /> 1317.1 MD GL <br /> 5400 <br /> 1400 <br /> DV/ACP Tool • 5300 <br /> 1488.4 MD KB 1500 • <br /> Measured Depth (GL)- soo 5200 <br /> West Intermediate Hole Drill Path �,o East <br /> 13.5"dia., 8.5°/100'Build Rate <br /> 1317.1-2360.0 MD GL ssoo <br /> TD in Lower UBB <br /> Production Liner '800 <br /> 7.00" OD x 6.366" ID <br /> TD LTC and FJ Steel 9.625" OD x 7.0" ID <br /> 3850.8 MD GL Intermediate <br /> MD GL KLX Liner Hanger 9°0 5000 <br /> Intermediate Casing <br /> 9.625" OD x 8.921" ID; J-55, 36.0 Ib/ft -2123.2 MD GL <br /> Production Hole Drill Path 6.241" Drift; 7.875"Coupling OD Install at DS PBcA <br /> 8.5"dia. Directional Hole 0-2360.0 MD GL Cement Plug to Surface - <br /> 2360.0-3850.8 MD GL Landed Casing in Lower UBB 4900 <br /> w ti I w N N 1 N o 0.0-2131.3 MD GL <br /> 00 o p A O <br /> o r <br /> Dissolution Surface <br /> � 4800 <br /> `P&A <br /> Cast Iran Bridge Plug (CIBP) > <br /> 2131.3 MD GC w <br /> Natural Soda LLC <br /> 16H-IR-E Well Prognosis - P&A <br /> Section 36, T1S, R98W Rio Blanco County, CO <br /> Daub&Associates,Inc. Date:May 12,2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.