My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-05-09_ENFORCEMENT - M2018052A
DRMS
>
Day Forward
>
Enforcement
>
Minerals
>
M2018052
>
2019-05-09_ENFORCEMENT - M2018052A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 6:55:00 AM
Creation date
5/10/2019 9:45:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2018052A
IBM Index Class Name
ENFORCEMENT
Doc Date
5/9/2019
Doc Name
4th/Final Notice
From
Sunnit County
To
DRMS
Email Name
ECS
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> M <br /> o Surface Drainage Plans <br /> Erosion Control Plans <br /> o Revegetation Plans <br /> The grading, drainage, and erosion control plans required above shall be prepared and signed by an engineer <br /> licensed in the State of Colorado having knowledge and experience in civil engineering in accordance with Sections <br /> 6207 and 7102.05 of the Code. The revegetation plan required above shall meet the standards set forth in Section <br /> 7101 A I.D of the Code and shall be prepared by an individual having a degree in landscape architecture or <br /> comparable expertise, and sufficient experience in landscaping installation and maintenance to ensure the success <br /> of the plans they propose in accordance with Section 7102.06 of the Code. <br /> Due to unique site considerations, the Engineering Department requires you to submit an executed site <br /> improvements agreement and financial guarantee acceptable to the Engineering Department prior to issuing a <br /> grading permit in accordance with Section 6302.06 of the Code. Unique site considerations include, but are not <br /> limited to: <br /> • Hazardous conditions that are likely to occur as a result of incomplete or improper grading; <br /> • Potential adverse effects on the surrounding environment, properties or community as a result of <br /> incomplete or improper grading; and <br /> • Adverse geological or environmental impacts as a result of incomplete or improper grading. <br /> As stated in the third letter, you were required to submit an application for permits to resolve these violations <br /> prior to January 15, 2019, with completion of all related work by July 15, 2019. In consideration of concurrent <br /> action by the State of Colorado DRMS, which specified a submittal deadline of April 25, 2019, we extended our <br /> submittal date to April 25,2019. Each of these dates have now passed,without the required submittals.Therefore, <br /> if these materials are not submitted by May 31,2019 we will have no choice but to refer this matter to the County <br /> Attorney's office for further action. Potential remedies include criminal or civil penalties pursuant to Colorado <br /> Revised Statutes §§30-28-124(1)(c) and 30-28-209. <br /> In providing you with this information and your fourth and final notice,we want to impress upon you that the <br /> County takes such violations seriously and is obligated by law to rectify them. Please contact our office <br /> immediately to set up an appointment to discuss how these issues will be addressed. Until further notice, and for <br /> your own and the public's safety, immediately cease all occupation and use of the unpermitted structures and <br /> mining equipment. <br /> Sincerely, <br /> dr <br /> ,!*W <br /> Ln <br /> Scott HoQ'� <br /> ff on Reimer <br /> Chief Building Official Planning Director <br /> Summit County Building Department Summit County Planning Department <br /> ul G <br /> Engineer I <br /> Summit County Engineering Department <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.