Laserfiche WebLink
#14 After the initial 14-day use of the excavator,the excavator will be removed off site. <br /> #15 The only internal combustion engine onsite after the initial 14-days will a diesel-powered <br /> air compressor that is tier four compliant with additional sound suppressor. In addition to two <br /> pickup trucks for transportation of two men and materials to and from the site each day. <br /> Quantity of Material Moved: <br /> Surface: The quantity of material that needs moved aside from the portal#1 and portal #2 is <br /> approximately 3 tons per portal. This material is the scree/slide rock that has stacked up in and <br /> around the portal. The Scree rock will be placed adjacent to both portal openings. <br /> Sub Surface: The quantity of material moved will be approximately 200 pounds per day. <br /> This material is bagged sub surface,transported to the surface on a mine cart and then placed <br /> directly in the back of the pickup truck. Roughly 1,400 pounds per week will be transported for <br /> laboratory analysis. The total sub surface material transported throughout the exploration project <br /> will be approximately 8,400 pounds maximum. <br /> Exploration Map: <br /> ° <br /> "ME <br /> L,0! <br /> at <br /> s. <br /> I' <br /> t <br /> Contact Information: <br /> Phone Number: 970-901-9043 ieef!IVEB <br /> Email: tyler(a,sweetwatermininc.com _jeffnsweetwatermining.com MAY O g 2019 <br /> delaneyna,sweetwatermining.com <br /> DMSION OF RECLAMATION <br /> MINING AND WETY <br />