My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-05-08_PERMIT FILE - P2019008
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2019008
>
2019-05-08_PERMIT FILE - P2019008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 9:23:16 AM
Creation date
5/8/2019 3:00:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2019008
IBM Index Class Name
PERMIT FILE
Doc Date
5/8/2019
From
Sweetwater Mining
To
DRMS
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase five consists of removing all tools off of location, closing the metal grated doors and <br /> locking the doors with a padlock. Since there will be no interior ore on the surface throughout <br /> the exploration process,there will be no tailings piles on the surface. No further work will be <br /> done onsite until a mining Plan of Operations in executed to begin the next phase of small scale <br /> mine development. <br /> In the event that the pending Plan of Operations is not approved and in place by November 15, or <br /> by the onset of winter conditions, whichever comes first, then the site will be groomed to prevent <br /> erosional runoff and protective measures will be installed to minimize erosion including,but not <br /> limited to, adding straw waddles, hay bales, and silt fences over the disturbed ground and/or <br /> where potential erosion may occur. All equipment outside the mine portals will be removed from <br /> the site. The site will be left clean and orderly over the winter season. <br /> Type and Size of Equipment to be Used: <br /> Equipment: <br /> Bobcat E32 Compact Rubber Tracked Excavator—Tier 4 Compliant <br /> Air Compressor Tier 4 Compliant with additional muffler silencer—Powering a mine air <br /> drill/driver& a pneumatic ventilation fan. <br /> Pneumatic Ventilation Fan—24" dimeter with intake screen—powered off of air compressor <br /> Dewalt Battery Powered Skill Saw <br /> Water Pump <br /> Dewalt Battery Powered Drill/Driver <br /> Metal Ore Cart—To transport bagged samples from the sub-surface working to the surface. <br /> GMC 1500 pickup truck—Materials and sample transport <br /> Toyota Tacoma—Crew Transport <br /> Gardner Denver Pneumatic Mine Drill/Driver—Sub surface use only <br /> Hand Crosscut Saws <br /> Framing Hammers <br /> Rock Hammers—Sub surface use only <br /> Rock Chisels—Sub surface use only <br /> Scaling Bars <br /> Sample Bags <br /> 500 Gallon Portable Water Storage Container—Sub surface use only <br /> No Spill Fuel Containers <br /> Spill ground protection <br /> Mine Air Hose <br /> Porta John <br /> Fire Extinguishers <br /> First Aid Kit <br /> Ventilation Extensions <br /> Exploration Site Access: <br /> Site access from the town of Tincup Colorado will use Forest Service road 765 connecting to <br /> Forest Service road 765k and a small unmarked spur road that was left from previous miners to <br /> access both portals. The spur road is in good condition and would require no modifications. <br /> Time Onsite• <br />
The URL can be used to link to this page
Your browser does not support the video tag.