Laserfiche WebLink
PART I <br /> Permit No.: COR400000 <br /> Documents required for submittal to the division in accordance with this permit, <br /> including applications for permit coverage and other documents as requested by the <br /> division, must include signatures by both the owner and the o ep rator, except for <br /> instances where the duties of the owner and operator are managed by the owner. <br /> Signatures on all documents submitted to the division as required by this permit must <br /> meet the Standard Signatory Requirements in Part II.K. of this permit in accordance <br /> with 40 C.F.R. 122.41(k). <br /> i. Signature Certification <br /> Any person(s) signing documents required for submittal to the Division must make <br /> the following certification: <br /> "I certify under penalty of law that this document and all attachments were <br /> prepared under my direction or supervision in accordance with a system designed <br /> to assure that qualified personnel properly gather and evaluate the information <br /> submitted. Based on my inquiry of the person or persons who manage the system, <br /> or those persons directly responsible for gathering the information, the <br /> information submitted is, to the best of my knowledge and belief, true, accurate, <br /> and complete. I am aware that there are significant penalties for submitting false <br /> information, including the possibility of fine and imprisonment for knowing <br /> violations." <br /> f. Compliance Document Signature Requirements <br /> Documents which are required for compliance with the permit, but for which <br /> submittal to the division is not required unless specifically requested by the division, <br /> must be signed by the individuals) designated as the Qualified Stormwater Manager, <br /> as defined in Part I.E. <br /> i. Any person(s) signing inspection documents required for compliance with the <br /> permit must make the following statement: <br /> "I verify that, to the best of my knowledge and belief, all corrective action and <br /> maintenance items identified during the inspection are complete, and the site is <br /> currently in compliance with the permit." <br /> g. Field Wide Permit Coverage for Oil and Gas Construction <br /> At the discretion of the division, a single permit certification may be issued to a single <br /> oil and gas permittee to cover construction activity related discharges from an oil and <br /> gas field at multiple locations that are not necessarily contiguous. <br /> h. Permit Coverage without Application <br /> Qualifying Local Program: When a small construction site is within the jurisdiction of a <br /> qualifying local program, the owner and operator of the construction activity are <br /> authorized to discharge stormwater associated with small construction activity under <br /> this general permit without the submittal of an application to the division. Sites <br /> covered by a qualifying local program are exempt from the following sections of this <br /> general permit: <br /> Page 4 of 33 <br />