Laserfiche WebLink
April 9, 2019 C-1981-018/Deserado Mine CCW <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 6 <br />Number of Complete Inspections this Fiscal Year: 4 <br /> <br /> Page 3 of 13 <br /> <br />- The riprap channel from the east cell of the RP-2/3 Pond into the main cell of the pond had slightly <br />eroded. Please repair the channel to original design specifications. (Photo 10) <br />- The embankment of the west cell of the RP-2/3 Pond had minor embankment erosion. Evidence of <br />the embankment being overtopped into the main cell of the RP-2/3 Pond was observed. Please <br />repair the embankment erosion and ensure the embankment is returned to original specifications to <br />prevent further overtopping of the embankment. (Photo 11) <br />- The Division recommends clearing a tree located next to the primary discharge outlet of the RP -4 <br />Pond. (Photo 12) <br /> <br />Photo 1: The primary spillway of the DP -1 Pond. Photo 2: The eastern ditch from the processing plant to DP -1. <br /> <br />Photo 3: The North ditch at the processing plant. Photo 4: The primary spillway at the PP -2 Pond.