Laserfiche WebLink
i. Rip-Rap Sediment Outlets-Rip Rap outlets may need to be installed in areas that <br /> will receive a majority of the sites potential runoff. The goal of these <br /> sediment traps will be to filter out any sediment before the water leaves the <br /> site. The traps will be monitored carefully to ensure there is no buildup of <br /> sediment within the trap allowing it to remain functioning properly. <br /> As the plan currently sits, no drainage or conveyance structures, such as culverts, will be <br /> needed in regards to the access roads within the proposed mine disturbances. The area <br /> where the access roads will be located sheet flow naturally. Our access roads will not affect <br /> this drainage as they run in parallel to the existing drainage patterns. <br /> Water Usage <br /> During the operation of the proposed mine,water will be used primarily to control fugitive dust. <br /> This includes controlling dust within the pit's mining footprint. <br /> Water needs for the proposed mine are anticipated to be small and will more than likely only <br /> require a water truck to water the area at a frequency determined by daily conditions.Owner will <br /> ensure the area remains adequately watered to avoid any complaints or violations of laws or <br /> regulations that govern an operation such as this. <br /> Use of Explosives <br /> No explosives will used at any point in this proposed pit.No further information needed. <br /> ;4 <br />