Laserfiche WebLink
2.05.3 <br />During storage, the topsoil stockpile will be stabilized with the temporary <br />revegetation mixture as shown in Table 3.4-2. <br />The topsoil stockpile will be sprayed with round up as necessary to control <br />cheatgrass establishment. <br />Topsoil Salvage Volumes <br />Area <br />Salvage Area <br />Acres <br />Average <br />Thickness <br />Salvage <br />Volume C.Y. <br />Sediment Pond <br />0.7 <br />24" <br />2,288 <br />Greasewood Flats <br />1.81 <br />24" <br />5,871 <br />Existing Stockpile <br />2,000 <br />Totals <br />10,200 <br />Haul road #1 and the portal area are pre-SMCRA and therefore topsoil was <br />not salvaged, nor will topsoil be replaced, (a total of 7.8 acres). The area <br />where the existing topsoil pile is founded did not have topsoil salvaged, that <br />area is approximately 0.2 acres and topsoil will not be replaced. <br />'Greasewood flats' area refers to the area surrounding the topsoil stockpile <br />and in front of and including a portion of the construction stockpile. The <br />greasewood flats area adjoins the previously disturbed area boundary. The <br />founding of the coal mine waste pile is in the footprint of the existing <br />sediment pond, no new topsoil will be salvaged from that area. <br />Otherwise, topsoil will be redistributed in the thicknesses shown below; <br />PR -02 2.05-26- 10/12 <br />