Laserfiche WebLink
Closure Cost Estimate <br /> Waste Rock Dumps <br /> Project Name: TR114 Silo-Reclamation Plan <br /> Date of Submittal: 4/9/2019 <br /> File Name: TR114 Silo SRCE TVO 04092019.xism <br /> Model Version:Version 1.4.1 <br /> Cost Data:User Data <br /> Cost Data File:SRCE_CCV_bonding_cost_data_ffle.xism <br /> Cost Estimate Type:Surety Cost Basis:Northern Nevada Bonding <br /> Waste Rock Dumps-Cost Summary <br /> Labor Equipment Materials Totals <br /> Grading Costs $124 $498 N/A $622 <br /> Cover Placement Cost s0 $0 N/A $0 <br /> Topsoil Placement Cost s0 $0 N/A $0 <br /> Ripping/Scarifying Cost $0 N/A $0 <br /> Subtotal Earthworks $124 $498 $0 $622 <br /> Revegetation Cost $0 $0 s0 $0 <br /> TOTALS $124 $498 $0 $622 <br /> Waste Rock Dumps-Scarifying/Revegetation Costs <br /> Scaritying/ <br /> Total Flat Area Ripping/ Slope Flat Area 5carifying/ Ripping Total Revegetation Revegetation Revgetation Total <br /> Description Slope Flat Surface Final Slope Long Scarifying Scarifying/ Scarifying/ Ripping Labor Equipment Scarifying/ Labor Equipment Material Revegetation <br /> (required) Area Area Area Length Dimension Fleet Ripping Hours Ripping Hours Costs Cost Ripping Costs Cost Cost Cost Cost <br /> acres acres acres it ft him hrs $ $ $ $ $ $ $ <br /> 1 Grade Retaining wall 0.00 0.00 54 $0 $0 $0 $0 $0 $0 $0 <br /> 2 Grade Retaining wall Ends 0.00 0.00 27 $0 $0 $0 $0 $0 $0 $0 <br /> $0 $0 $0 $0 $0 $0 <br /> Notes:1)Minimum total ripping hours=1(i.e.If total ripping hrs(slope+flat)-1,then one hour of fleet time is assumed,regardless of acres shown in in scarifying table.) <br /> 4/15,2019 <br /> Page 6 of 6 Waste Rock Dumps <br />