Laserfiche WebLink
Closure Cost Estimate <br /> Waste Rock Dumps <br /> Project Name: TR114 Silo-Reclamation Plan <br /> Date of Submittal: 4/9/2019 <br /> File Name: TR114 Silo SRCE TVO 04092019.xism <br /> Model Version:Version 1.4.1 <br /> Cost Data:User Data <br /> Cost Data File:SRCE_CCV_bonding_cost_data_file.xlsm <br /> Cost Estimate Type:Surety Cost Basis:Northern Nevada Bonding <br /> Waste Rock Dumps-Cost Summary <br /> Labor Equipment Materials Totals <br /> Grading Costs $124 $498 N/A $622 <br /> Cover Placement Cost s0 $0 N/A $0 <br /> Topsoil Placement Cost $0 $0 N/A $0 <br /> Ripping/Scarifying Cost $0 N/A $0 <br /> Subtotal Earthworks $124 $498 $0 $622 <br /> Revegetation Cost SO $0 s0 $0 <br /> TOTALS $124 $498 $0 $622 <br /> Waste Rock Dumps-Cover and Growth Media Costs <br /> Cover(lower layer) Growth Media Placement <br /> Cover Number of Cover Cover Growth Media Number of Total Total <br /> Description Cover Replacement Fleet Trucks/ Total Fleet Labor Equipment Growth Media Replacement Fleet Trucks/ Total Fleet Labor Equipment Total Topsoiling <br /> (required) Volume Fleet Productivity Scrapers Hours Cost Cost Total Cover Cost Volume Fleet Productivity Scrapers Hours Cost Cost Cost <br /> cy LCY/hr $ $ $ cy BCY/hr $ $ $ <br /> 1 Grade Retaining wall 0 Cover Material over Materia $0 $0 $0 $0 $0 SO <br /> 2 Grade Retaining wall Ends 0 Cover Material over Matera $0 $0 $0 $0 $0 $0 <br /> $0 $0 $0 $0 $o $0 <br /> 4/152019 <br /> Page 5 of 6 Waste Rock Dumps <br />