Laserfiche WebLink
Closure Cost Estimate <br /> Waste Rock Dumps <br /> Project Name: TR114 Silo-Reclamation Plan <br /> Date of Submittal: 4/9/2019 <br /> File Name: TR114 Silo SRCE TVO 04092019.xism <br /> Model Version:Version 1.4.1 <br /> Cost Data:User Data <br /> Cost Data File:SRCE_CCV_bonding_cost_data_ffle.xlsm <br /> Cost Estimate Type:Surety Cost Basis:Northern Nevada Bonding <br /> Waste Rock Dumps-Cost Summary <br /> Labor Equipment Materials Totals <br /> Grading Costs $124 $498 N/A $622 <br /> Cover Placement Cost $0 s0 N/A $0 <br /> Topsoil Placement Cost $0 SO WA $0 <br /> Ripping/Scarifying Cost $0 N/A $0 <br /> Subtotal Earthworks $124 $498 $0 $622 <br /> Revegetation Cost $0 $0 $0 $0 <br /> TOTALS $124 $498 $0 $622 <br /> Waste Rock Dumps-User Input(cont.) You must fill in ALL green cells and relevant blue cells in this section for each dump,lift or dump category <br /> ra Ing Cover Growth Media Revegetation <br /> Cover Growth Growth <br /> Dump Grading Cover Placement Media Media <br /> Description Dozing Material Material Equipment SI.VSide-by- Material Equipment Material Equipment Seed Mix Seed Mix Flat Mulch Mulch Fertilizer Fertilizer Slope Scarify/ Flat Area Scarify/Scarify/Ripping <br /> (required) Condition Type Fleet Side Type Fleet Type Fleet Slopes Areas Slopes Flat Areas Slopes Flat Areas Rip? Rip? Fleet <br /> select) (select) (select) (select) (select) Iselecq (select) (select) (.elect) (select) (select) (,elect) se ecp (,elect) (select) (select) (select) <br /> 1 Grade Retaining wall 1 Granite-broker Large Yes <br /> 2 Grade Retaining wall Ends 1 Granite-broker Large Yes <br /> Notes <br /> 1.Material Types are used for density correction based on material densities in Caterpillar Performance Handbook material density table <br /> 41162019 <br /> =I''ii x,,,. N Page 2 of 6 Waste Rock Dumps <br />