My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-04-15_REVISION - C1981028
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981028
>
2019-04-15_REVISION - C1981028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2019 9:15:35 AM
Creation date
4/16/2019 10:50:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
Revision
Doc Date
4/15/2019
Doc Name Note
Revised Cost Estimate
Doc Name
Reclamation Cost Estimate
From
Zach Trujillo
To
Rob Zuber
Type & Sequence
MT7
Email Name
ZTT
RDZ
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCRAPER TEAM WORK <br /> <br />Task description: Haul topsoil to “Other Areas” (parcel 42 and 43) <br />Site: Keenesburg Strip Mine Permit Action: MT7 Permit/Job#: C1981028 <br /> <br />PROJECT IDENTIFICATION <br /> <br />Task #: E03 State: Colorado Abbreviation: None <br />Date: 4/15/2019 County: Weld Filename: C028-E03 <br />User: ZTT <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COSTShift basis: 1 per day <br /> <br /> Equipment Description <br />-Scraper: Cat 637G w/push-pull <br />-Dozer: NA <br />Support Equipment -Load Area: Cat D9T - 9SU <br />-Dump Area: Cat D9T - 9SU <br />Road Maintenance –Motor Grader: CAT 14M <br />-Water Truck: Water Tanker, 3,500 Gal. <br /> <br />Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br />%Utilization-machine: 100 NA 25 100 25 25 <br />Ownership cost/hour: $165.84 NA $110.70 $110.70 $60.13 $12.39 <br />Operating cost/hour: $172.14 NA $23.87 $95.46 $12.72 $6.50 <br />%Utilization-ripper: NA NA NA NA NA NA <br />Ripper own. cost/hour: NA NA $0.00 $0.00 $0.00 $0.00 <br />Ripper op. cost/hour: NA NA $0.00 $0.00 $0.00 $0.00 <br />Operator cost/hour: $45.84 NA $40.23 $40.23 $45.64 $39.10 <br />Unit Subtotals: $383.81 NA $174.80 $246.39 $118.49 $57.99 <br />Number of Units: 2 0 1 1 1 1 <br />Group Subtotals: Work: $767.62 Support: $421.19 Maint: $176.48 <br />Total work team cost/hour: $1,365.29 <br /> <br />MATERIAL QUANTITIES <br />Initial volume: 8,155 CCY Swell factor: 1.060 <br />Loose volume: 8,645 LCY <br />Source of estimated volume: 2018 ARR <br />Source of estimated swell factor: Cat Handbook <br /> <br />HOURLY PRODUCTION <br /> Scraper Bowl (volume) Basis: <br />Material weight: 2,850 lbs/LCY Struck Volume: 24.00 LCY <br />Material description: Sand - Damp Heaped Volume: 34.00 LCY <br />Rated Payload: 81,600 pounds Average Volume: 29.00 LCY <br />Payload Capacity: 28.63 LCY Adjusted Capacity: 28.63 LCY <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.