My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-04-15_REVISION - C1981028
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981028
>
2019-04-15_REVISION - C1981028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2019 9:15:35 AM
Creation date
4/16/2019 10:50:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
Revision
Doc Date
4/15/2019
Doc Name Note
Revised Cost Estimate
Doc Name
Reclamation Cost Estimate
From
Zach Trujillo
To
Rob Zuber
Type & Sequence
MT7
Email Name
ZTT
RDZ
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Cycle Time: <br />Scraper Loading Time: 1.00 Minutes <br />Maneuver and Spread Time: 0.60 Minutes <br />Job Condition Correction: Site Altitude: 4000 feet <br /> Scraper Push Dozer Source <br />Altitude Adj: 1.000 NA (CAT HB) <br />Job Efficiency: 0.830 NA (CAT HB) <br /> <br />Net Correction: <br /> <br />0.830 <br /> <br />NA <br />Travel Time: <br /> Road Condition: Firm, smooth, rolling, dirt/lt. surfaced, watered, maintained 3.0 <br />Haul Route: <br />Seg # Haul Distance (Ft) Grade <br />(%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel Time <br />(min) <br />1 1900.00 0.00 3.00 3.00 2800 0.97 <br />Haul Time: 0.97 minutes <br />Return Route: <br />Seg # Haul Distance (Ft) Grade <br />(%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel Time <br />(min) <br />1 1900.00 0.00 3.00 3.00 2949 0.79 <br />Return Time: 0.79 minutes <br />Total Scraper team cycle time: 3.36 minutes <br />Adjusted for job conditions: 848.72 LCY/Hour <br />Selected Number of Scrapers: 4 Scraper(s) <br />Adjusted single scraper team (unit) hourly production: 1,697.44 LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: 1,697.44 LCY/Hour <br />Unadjusted unit production/hour: 1,022.56 LCY/Hour <br />Optimal Number of Scrapers per push <br />dozer: <br /> <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 77.41 Hours <br /> <br />Unit cost: <br /> <br />$1.340 <br /> <br />/LCY <br /> <br />Total job cost: <br /> <br />$176,077 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.