My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-04-02_GENERAL DOCUMENTS - C1984065
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1984065
>
2019-04-02_GENERAL DOCUMENTS - C1984065
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2019 8:31:18 AM
Creation date
4/16/2019 8:30:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984065
IBM Index Class Name
General Documents
Doc Date
4/2/2019
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
C.B. Minerals Company, LLC
Type & Sequence
MT8
Annual Report Year
2019
Permit Index Doc Type
Findings
Email Name
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Coal Ridge No. 1 Mine C-1984-065: MT-08 April 2, 2019 <br /> <br />Page 11 of 27 <br /> <br /> <br />BULLDOZER WORK <br /> <br />Task description: Backfill Sediment Pond A <br />Site: Coal Ridge No. 1 Mine Permit Action: MT8 Permit/Job#: C1984065 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 006 State: Colorado Abbreviation: None <br />Date: 3/18/2019 County: Garfield Filename: C1984065 <br />User: ZTT <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9T - 9SU <br />Horsepower: 405 <br />Blade Type: Semi-Universal <br />Attachment: NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br /> Utilization % <br />Ownership Cost/Hour: $110.70 NA <br />Operating Cost/Hour: $95.46 100 <br />Ripper own. Cost/Hour: $0.00 NA <br />Ripper op. Cost/Hour: $0.00 0 <br />Operator Cost/Hour: $41.52 NA <br />Total unit Cost/Hour: $247.68 <br />Total Fleet Cost/Hour: $247.68 <br /> <br />MATERIAL QUANTITIES <br />Initial Volume: 10,785 <br />Swell factor: 1.165 <br />Loose volume: 12,565 LCY <br />Source of estimated volume: Plate 4-1 <br />Source of estimated swell factor: Cat Handbook <br /> <br />HOURLY PRODUCTION <br />Average push distance: 100 feet <br />Unadjusted hourly production: 1,243.2 LCY/hr <br /> <br />Materials consistency description: Compacted fill or embankment 0.9 <br /> <br />Average push gradient: -10 % <br />Average site altitude: 5,700 feet <br /> <br />Material weight: 2,900 lbs/LCY <br /> <br />Weight description: Decomposed rock - 50% Rock, 50% Earth
The URL can be used to link to this page
Your browser does not support the video tag.